The Proven 15 kW turbine; designed for reliability and performance
EWEC Athens 2006, CW32. Small wind turbine systems. Proven Energy Ltd., Johnnie Andringa
2
Next 15 minutes Products & company Turbine design & safety
15 kW blade development Blade material Moulds and process Blade tests Further Development Turbine performance Status
3
Products First turbine Rannoch Moor, now, 17 years later still up & running 2.5 and 6 kW Transition from off-grid to on-grid Household and professional customers
4
Company Based in Scotland; high winds and many remote islands
Export to over 30 countries 2005; 150 turbines, growing over 50% year on year
5
Turbine design Simplicity: reliability Direct drive
PM generator, no rotating coil Brake disk Downwind, passive yaw Low rpm; tip speed < 65 m/s; low noise
6
Safety mechanism Passive pitch: elastic hinge with prestressed springs
Blades cone downwind
7
15 kW development Same concepts as smaller turbines Basic numbers:
9.5 m diameter 95 …160 rpm rated 11 m/s Blade: twintex; 15 kg each Development started 3 years ago
8
Blade development 2.5 kW; full PolyPropylene as blade material
Tough and non-sticky 6 kW; wood epoxy Manufacturing of larger shapes Vulnerable (impact) 15 kW started with glass-epoxy ended with twintex (Glass with PP matrix) As above and ‘recyclable’; melt PP from glass However; ‘NEW’ material and process
9
Moulds Elevated temperature; expensive moulds
10
Process Filling of mould Blade has a rib Vacuum forming in oven
11
Blade testing Hinged blade; low bending moments (IEC)
Static tensile & bending test Same design, same mould Improvements in production Over 3-fold increase in critical strength More consistent quality
12
Further development Hub, Generator, Controller, Automatic brake
Covers are designed; styling of turbine
13
Turbine Performance Theoretical / experimental analysis of springs
Optimise power curve and safety mechanism
14
Status PERFORMANCE was achieved early
Establishing RELIABILITY took longer, especially with new production process Now entering final 6 months live cycle test Full scale production starts 2007 IEC 61400/2 standard and procedures helpful