1 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers Meeting, April 14th, 2004 Elliott Bloom SU-SLAC Subsystem Manager elliott@slac.stanford.edu 650-926-2469 Gamma-ray Large Area Space Telescope

2 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 2 IFCT Role in Functional Tests (Larry W.) IFCT is responsible for helping to design/define and implement I&T functional tests on the subsystem and LAT level (see Pat’s presentation) with major input to LAT-MD-02730. The test scripts used in the functional testing will actually be implemented by the I&T online department with guidance from LAT-MD-02730 and IFCT. The test scripts will be placed under configuration control by I&T online. The test procedures will be owned and configuration controlled by IFCT. All I&T testing of flight hardware will be performed by IFCT department electrical technicians and engineers who have been trained in their use. IFCT will need major assistance from the subsystems in helping to interpret the results of the tests (pass/fail with report). Particularly, in the case of fail (see SVAC role slide 4).

3 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 3 ACD –2,200 hours for checkout/testing/support. (1 man year) Calorimeter –1.5 FTE's (not continuously?) and travel expenses for Calorimeter I&T Support. DAQ –700 hours for hardware I&T support. (4 man months) Flight Software –1,800 hours for software I&T support. (10 man months) Mechanical –?? SAS – ?? Tracker –2 FTEs (Subsystem scientists) (3 man years) –Hiro Tajima, Johann Cohen-Tanugi (SLAC) (3 man years) Subsystem Support of I&T after Delivery From 7/04 – 1/06 ?

4 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 4 SVAC LAT Build Data Analysis Role (Eduardo) There are two SVAC data analysis efforts that support the LAT build and test and both use the same test data –Analysis of “Pass/Fail” test data of the flight hardware relative to an established baseline (See previous manpower chart slide 3). –Determine hardware baseline and calibrations –Results due with hours or, at most, a day (TBR) –I&T, SAS and Subsystems effort, e.g., CPT test offline. –Analyses of data from the flight instrument in various stages of completion, which assume a well understood baseline and calibrations (LAT wide collaboration effort). –Uncover subtle hardware problems –Apply SAS reconstruction algorithms to real data –Results due in 2 to 3 weeks after data taking (TBR).

5 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 5 I&T/SVAC Department Meetings (Eduardo) Date : Weekly (Friday) Location : SLAC, Group C conference Room, B84 Goal : Prepare for data analysis of pass and fail tests and instrument data analysis. (Working meeting, those interested in contributing are welcome.) –PASS/FAIL tests –Review plots from subsystems to evaluate if changes are necessary for tests at the integrated level. –Scheduled a meeting on April 30 between I&T (SVAC and Online), SAS and ISOC to discuss monitoring of parameters during integrated tests and details of implementation and present SVAC tool to monitor offline calibrations. –SAS recon analysis may not be required at this level but we may use SAS code for digitized data (TBR) –I&T driven effort –Instrument test Analysis –LAT Collaboration effort. See next slides –Infrastructure necessary –SAS Data pipeline (OPUS), MC and GlastRealease –Data analysis code to estimate run time needed during data taking –Offline Report generation – We were given no requirements so far –Tool to compare offline results - We were given no requirements so far.

6 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 6 SVAC Instrument Analysis Workshop 1 SVAC Instrument Analysis Workshop 1 Date : June 7 (Monday) and 8 (Tuesday), 2004 Location : SLAC, June 7 (ROB C&D), June 8 (TBD) Goal : Prepare for data analysis during LAT build and testing. –Produce MC datasets with two-towers in a grid at different configurations to –Validate geometry implementation –Create datasets for data analysis –Recommend data set sizes based on MC studies –Define and assign tasks to participants to –Evaluate if there are modifications necessary to the reconstruction –Evaluate if there are modifications necessary to the analysis (merit) ntuple –Create reference plots for different configurations –Define infrastructure necessary for –Data pipeline (OPUS) –Report generation –Comparison of results

7 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 7 Instrument Analysis Workshop 2 Instrument Analysis Workshop 2 Date : Early July 2004 (TBD, depends on IRR) Location : SLAC Goal : Evaluate MC results and implement changes needed for data analysis of LAT data obtained during various stages of the build and testing. –Evaluate results and regenerate MC datasets if necessary –Suggest modifications for data analysis tests with real data and flight hardware –Work with I&T to evaluate if the data set sizing is –adequate to understand the instrument –and if collection times fit the LAT build and test schedule. –Define what analyses will be done during the build sequence. –The plan is to have data taking with 1,2,4,6,8,10,12,14,16 towers and 16 towers with ACD. –Define infrastructure needed for full LAT analysis

8 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 8 Interdependencies: subsystems, LAT office and/or project office. Completion of LAT-MD-02730 “LAT Performance and Operations Test Plan” Input on specific processes/procedures for integration (subsystems). EGSE deliveries from Electronics (see following chart). Tracker Mechanical mock-up and 5 tray mini-tracker tower parts from Tracker.

9 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 9 I&T Overview to Start of Integration Training & Procedure Verification 6/18/04 Integration Procedures Mechanical and Electrical 6/18/04 Integration Readiness Review 7/8/04 I&T Mockup 4/1/04 LATTE v.3.0 4/1/04 I&T Plan LAT-MD-01376 5/1/04 I&T Functional Test Scripts 6/1/04 MGSE Development Plan v.2 5/15/04 Drawings 5/1/04 Fabrication 6/14/04 Proof Testing 7/21/04 Receive Flight Hardware Start Integration * Final though two tower CPT, releases to support integration procedure development LATTE v.3.n V &V 5/8/04 – 7/8/04 Bldg 33 Cert 6/18/04 Particle Test Equipment 6/18/04 Training & Script Verification 6/1/04 – 7/1//04 Survey Plan 5/1/04 draft (done) 5/31/04 final Requirements LAT-MD-02730 6/10/04 * Electronics Test-Bed 5/04 Subsystem Scripts 5/1/04 EGSE Hwr Deliveries 6/1/04 Electronics Test-Bed 5/04

10 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 10 Electrical Ground Support Equipment (EGSE) / Online Flow Integration Readiness Review 7/8/04 LATTE v.3.0 with GASU support 4/1/04 I&T Functional Test Scripts 6/1/04 Training 6/18/04 Peer Review 6/18/04 LATTE v.3.n V &V 5/8/04 – 7/8/04 Event Pre- scaling 5/8/04 Security – Configuration Control 5/8/04 LATTE v.3.n release 5/8/04 Script / Software Configuration Control 7/8/04 Electronic Logbook / Mate- Demate Log 6/1/04 Electronics Test-Bed 5/04 Subsystem Scripts 5/1/04 EGSE Hwr Deliveries (Electronics) 6/1/04 Power Up Sequence 5/8/04 Hardware Monitoring 5/8/04

11 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 11 Science Verification, Analysis, and Calibration (SVAC) - Roadmap Integration Readiness Review 7/8/04 SVAC Database and Calibration trending (March - July) SVAC Acceptance and Test of SAS Algorithms (May - July) 1 & 2 Tower Geometry (April – May) SAS Calibration Algorithms (May) SAS Database (May) SAS Pipeline Infrastructure (March - April) MC Datasets 1 & 2 tower (May) SAS Geometry Review (April) SVAC Data Pipeline (May-June) EM 1 data analysis (March - May) EM 2 data analysis (April - June) SVAC Workshops (June-July) Instrument Test Analysis (March – July)

12 GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 12 Critical issues I want discussed Finalization of LAT test requirements EGSE definition document needs to be completed. EGSE delivery plan. Is current schedule still OK? Time table for finalization of TKR-Grid interface and installation sequence. Tracker support for I&T mechanical model( delivery dates). –Flight cable design –Spare trays –5 th live tray