Download presentation
Presentation is loading. Please wait.
Published byPhillip Morton Modified over 9 years ago
1
0 Mining Methods Block 150 Level 330 Level 300 Level 270
2
1 Stope 9А Stage 1 Stage 2 60 m Level 330 Level 300 Level 270 Block 150
3
Slot raise Down drill blasting holes Block 150 Stope 9А Upper drill blasting holes Level 330 Level 300 Level 270 Stage 1 Stage 2
4
Mined stope 3D model (CMS) Stage 1 Level 330 Level 300 Level 270 Block 150 Stope 9А Stage 1 Stage 2
5
Slot raise Pillar rings Upper drill blasting holes Stage 1 Stage 2 Level 330 Level 300 Level 270 Block 150 Stope 9А
6
Mined stope 3D model (CMS) Stage 1 and 2 Stage 1 Stage 2 Level 330 Level 300 Level 270 Block 150 Stope 9А
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.