10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.

Similar presentations


Presentation on theme: "10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002."— Presentation transcript:

1 10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002

2 10/03/022 Comprehensive Stormwater Management Policy Ken Reisinger

3 10/03/023 Purpose Protect and maintain existing uses, water quality, water quantity, recharge aquifers, support base flow. Prevent stream bank and stream bed scour and destabilization. Integrate federal stormwater management requirements. Establish a consistent approach to stormwater management across DEP programs.

4 10/03/024 Draft Policy Public Notice in PA Bulletin on October 27, 2001. Public Comment Period ended January 28, 2002. 233 Commentators, Approx. 600 Comments. Key Comment Topics: Act 167 Antidegradation Conservation Districts Infiltration Regulatory Authority NPDES Permits Oppose/Support Policy Post Construction Permit Post Construction BMP Standards/Manual

5 10/03/025 Final Policy – September 28, 2002 Provides a recommended approach for meeting the underlying antidegradation regulations found at 25 Pa Code Section 93.4a. Enables efficient implementation of federal regulatory requirements (NPDES Stormwater from Construction Activity Permits, MS4 Permits). Identifies Act 167 Stormwater Management Planning Program as the centerpiece for municipal compliance with federal requirements. Addresses Post Construction Stormwater.

6 10/03/026 25 Pa Code Section 93.4a Special Protection Waters – Water quality of special protection water shall be maintained and protected. Waters other than Special Protection – Water uses and the level of water quality necessary to protect those uses shall be maintained and protected.

7 10/03/027 Performance goal to Replicate Natural Infiltration and Runoff Conditions: Comparative Pre and Post Construction Stormwater Analysis Minimize Runoff; Encourage Infiltration Water Quality Treatment BMPs Volume and Rate Discharge Control BMPs Protect Existing and Uses/Water Quality Post-Construction Stormwater Management: Build on Existing Permit Programs Using Existing Authority Integrate Act 167 and Permit Programs Develop a Stormwater BMP Guidance Manual. Major Objectives of the Policy:

8 10/03/028 Policy will be Implemented Through: The NPDES permit for construction activity program Phase I (earth disturbances 5 acres and greater) and Phase II (earth disturbances 1- 5 acres with a point source discharge) late 2002. The NPDES MS4 permit program effective March 2003. The 167 Stormwater Planning process.

9 10/03/029 Appendix A of the policy provides information and web links to stormwater management manuals that can be used to satisfy the goals and objectives of the policy: Maryland, Delaware, New Jersey, New York Center for Watershed Protection Interim Technical Guidance

10 10/03/0210 Development of Pennsylvania BMP Manual and Technical Guidance Pennsylvania Stormwater BMP Manual: Oversight Committee will be established. Develop Manual 10/02-10/03. Public comment on draft manual late 2003. Initial Training to Public/DEP/CDs: 01/04-06/04.

11 10/03/0211 Programs Key to Meeting Goals NPDES Construction Activities Municipal Separate Storm Sewer Systems (MS4s) Act 167 Watershed Planning

12 10/03/0212 NPDES Construction Program Ken Murin

13 10/03/0213 NPDES Construction Program In existence since 1992: EPA federal requirements: Phase I-1992; Phase II-2002 Program foundation Chapter 102 requirements-30 years Utilizes BMP/performance-based approach. Utilizes individual and general permits. Implemented by both DEP and by delegation to County Conservation Districts.

14 10/03/0214 Activities Which Require Individual Permit Coverage Discharges to Special Protection Waters- Chapter 93. Potential for Toxic Discharge. Significant History of Non-compliance. Adverse Affect on a PA or Federal Endangered Species or Habitat. Discharges that are otherwise prohibited by 25 Pa Code Chapter 92.

15 10/03/0215 Phase I-NPDES Construction Permit Existing Permit. Earth disturbance activities 5 acres or greater. Individual and general permit coverage. 5-year term Terminates at end of term; or Terminates after construction completed, site stabilized

16 10/03/0216 Phase II NPDES Construction Permit NPDES permit coverage for small construction activities (Required by December 8, 2002): 1-5 acres. Point source discharging to surface waters. Individual or general permit coverage. Waivers-not applicable in PA. Proposed a draft Phase II general permit. Refining Phase II permit based on public comments.

17 10/03/0217 NPDES Construction Permits and Stormwater Policy Both Phase I and Phase II permits: E&S Plan to minimize pollutants from earth disturbance. Post Construction Stormwater: Existing permit emphasizes identification of BMPs. Permits will now emphasize requirement for PCSM Plans. Interim technical references – Appendix A. Protect existing uses and maintain water quality.

18 10/03/0218 NPDES Construction Permit Timelines Phase I Permit Extension of Availability: 10/05/02. Phase I and II Construction Permit: 12/08/02. Phase II general or individual permit coverage required within 90 days (March 10, 2003) of permit availability. Outreach-October 2002-March 2003: Education and compliance materials. Conservation districts, municipalities, regulated community.


Download ppt "10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002."