seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006
2
seabed-to-surface Subsea UK June 1st 2006 slide 2 What we do SURF Conventional Trunklines IMR
3
seabed-to-surface Subsea UK June 1st 2006 slide 3 Africa & Mediterranean : Countries of operation 40% of ACERGY worldwide activity : circa 750 MUSD in 2005. 45% of which is related to procurement of Projects : 350 MUSD 450 MUSD foreseen in 2006 & 2007. Projects in the Gulf of Guinea Nigeria Angola Equatorial Guinea Congo Regional permanent implantation in Angola, Nigeria and Gabon.
4
seabed-to-surface Subsea UK June 1st 2006 slide 4 SCM Issues 1/2 Weak and critical point : Risky Remote environment Uncontrolled planning Installation Delivery on site Logistic FabricationTransportCustoms Engineering
5
seabed-to-surface Subsea UK June 1st 2006 slide 5 SCM Issues 2/2 How to succeed the installation ? Engineering : - over design => secure installation and in service life Fabrication :- zero default => high QA/QC capabilities How to succeed the delivery on site ? Ensure good structure for logistics : - Availability of transport (flexible planning) - Very good knowledge of local regulations which are constantly changing - Strong set up and full control of local logistics from shore to site.
6
seabed-to-surface Subsea UK June 1st 2006 slide 6 West African Top Priority : Local Content = Constraint but also an Opportunity 1. Constraint : Access to local Human Resources - Engineers (Engineering) - Workers (Fabrication) Control of Quality 2. Opportunity : Transport and Customs are cleared Upstream - Improve Float on planning - Less complex nature of goods to import. Installation Engineering Transport Customs Fabrication Delivery on site
7
seabed-to-surface Subsea UK June 1st 2006 slide 7 West Africa : A region with high “Country Specifics” CAPEX \ Investment Technology / Complexity Pipe fabrication (Steel mill) FlexibleUmbilicalsForgingEngineering Local logistic Coating Yard long-product base (Jacket-piles /double joint) lowhigh low
8
seabed-to-surface Subsea UK June 1st 2006 slide 8 SOME LOCAL REALISATIONS
9
seabed-to-surface Subsea UK June 1st 2006 slide 9 Nigeria : Warri Yard & Angola : Lobito Yard
10
seabed-to-surface Subsea UK June 1st 2006 slide 10 HRT in Lobito
11
seabed-to-surface Subsea UK June 1st 2006 slide 11 Manifolds in Lobito
12
seabed-to-surface Subsea UK June 1st 2006 slide 12 APL offloading Buoy
13
seabed-to-surface Subsea UK June 1st 2006 slide 13 YOKRI Deck fabrication in Warri
14
seabed-to-surface Subsea UK June 1st 2006 slide 14 Warri Fabrication Yard: Jacket - Suction Piles
15
seabed-to-surface Subsea UK June 1st 2006 slide 15 Warri Fabrication Yard: Jacket - Suction Piles
16
seabed-to-surface Subsea UK June 1st 2006 slide 16 Common objective for main Contractors and Suppliers : - Localisation in country with guaranteed quality and delivery Strong and relationship / partnership required Conclusion