W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.

Similar presentations


Presentation on theme: "W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator."— Presentation transcript:

1 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator DC-DC Adder mezz link cards BSCAN ASICs PHASE ASICs MLUs Back Bar Code Front Regional Cal. Trigger Complete - U. Wisconsin Receiver Card: Electron Isolation & Clock: Jet/Summary: Receiver Mezz. Card BSCAN ASICs Sort ASICs BSCAN ASICs Phase ASIC 158/164 tested (126) 154/154 Tested (126) 23/25 tested (18) 23/25 tested (18) (27/28 Custom Backpl Tested) (18) fraction tested (needed) EISO Clock Front Back Five full crates at CERNRest waiting at Wisconsin

2 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 2 Endcap Muon Trigger Milestone: Production & Testing Complete Mezzanine card TLK2501 serializers OptomodulesGTLP Receivers VME Interface (glue logic) Muon Port Card (Rice): Final production done (tested 67) Total needed: 60 (75 incl. spares) Sector Processor (Florida): Backplane produced (1 needed) 20 SP produced (12 needed): Muon Sorter (Rice): Sorter produced (1 needed)

3 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 3 Operate fully functional trigger electronics at CERN Employed in myriad tests & preparation activities Tests in Electronics Integration Center Labs & row of racks for all electronics subsystems Test interfaces & integration as much as possible before move to USC55 MTCC in SX5 Test multiple trigger components with multiple detector components during the magnet test. Verify trigger functions & interfaces w/detectors on surface Installation in Underground Counting Room (USC55) Started Mid-July ‘06 -- “ready for crates” Racks & Infrastructure installed, cooling operational RCT crates, power, infrastructure fully installed Passed CERN Safety Review Card installation next Underground Counting Room Trigger Commissioning USC55

4 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 4 Regional Calorimeter Trigger Crates, Fans, Power Supplies, Monitoring, Controls and other infrastructure installed, validated and passed safety check in July Ready for card installation

5 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 5 5 RCT Full Crates Operating at CERN - U. Wisconsin Rear of Full RCT crate fully cabled to HCAL trigger primitive logic Front of Full RCT crate with Jet Capture Card that continuously samples output, checks on the fly for errors and provides readout of 256 crossings Used for integration tests & board checkout after shipment

6 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 6 ECAL/HCAL/RCT Integration Tests HCAL HTR to RCT Used JCC to verify data 6 cables used - all in sync Latency measurements w/PMT as source of HCAL TPG ECAL TCC to RCT Valid link established Channel number sent as data 2 channels on 20 m cables sent in sync to RCT HCAL HTR & ECAL TCC to RCT 28 cables to RCT from 9 TCC & 18 HCAL HTR outputs Common clocking: LTC, TTCci 28 channels in sync - links stable for >10 hours error free running “Hydra” link cable checked as an option for two SLB’s to one RCT RMC ECAL - HCAL Pattern tests RCT can “lookup” incoming data LUTs can be programmed to duplicate incoming data Have ORCA emulation to help predict outputs HCAL HTR ECAL TCC RCT

7 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 7 RCT Integration Tests RCT to Local Timing Controller (for MTCC) Tests Receive 56 HCAL links (448 towers) in Green Barracks Send trigger out with RCT Jet Capture Card OR of towers in each half using Quality Bit Validated connection with LTC/GT GT ANDs top & bottom - reduces rate RCT Jet Capture Card to GT Tests Backup Global Calorimeter Trigger JCC in spare VME slot of RCT Crate Currently sends up to 4 trigger bits Threshold  E T, e/  candidate, MIP Tests using RCT pattern successful! ECAL TCC patterns yield JCC output Synchronized to Bunch crossing 0 RCT- GCT Source Card First test with new GCT Completed successfully in July

8 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 8 CSC Muon Trigger Status (Florida, Rice, UCLA) Peripheral Crate installation underway on disks: Full Track Finder System test complete: DT-CSC Interface Tested:

9 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 9 CSC trigger operations Operating in MTCC Currently set-up in SX5 as operated in 2004 beam tests Connected 10 chambers in ME+2 & ME+3  20 ° full slice on YE+2 CSC Track-Finder provides a cosmic muon trigger based on a coincidence of LCTs in two or more disks Currently triggering @ 50Hz with 2-station coincidence CSC track finder has already provided triggers used to pass data from the CSCs to the global DAQ. SP

10 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 10 Electronics Integration Center (Building 904) User Labs LV Tests System Tests Trigger Tests Assemble one each of critical racks in central trigger core in underground counting room Readout & trigger electronics testing labs See Next Slide

11 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 11 HCAL ECAL RCT GCT GT/ GMT TTC DTTF CSCTF Trigger Integration Progress in Electronics Integration Center (Pr. 904) Large scale successful integration tests in central racks using common TTC infra- structure involving trigger primitives, regional & global processing: Calorimeter Trigger Muon Trigger Global Trigger

12 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 12 TriDAS Commissioning in EIC A vital part of the trigger program: EIC (Bat. 904) is the only opportunity to test a large number of channels with close to final infrastructure before moving into USC55. Tests done in EIC are mostly a continuation of previous integration tests done in institute labs, but performed in an environment as close to USC55 as possible: rehearsal for USC55 activities Method: Download and synchronously propagate test patterns within and between trigger systems Use simulated data & data from test beams Goals: Test interfaces, software, synchronization, DCS… Prepare electronics for use in Cosmic Challenge Gain back some time lost in the delay of USC55 by testing everything possible before installation Completion of Electrical Clearance tests

13 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 13 CSC Track Finder Integration - Florida, Rice, UCLA Slice Test: cosmics running now! preparing full readout and self triggering of a whole trigger sector (60 o ). Since April 05 self-triggering with as close to nominal CMS setup as possible used to pass data CSCs to global DAQ. Goal: magnet test with 1/12th of the fully functioning CSC detector system EIC Integration Integration tests with Drift Tube Track Finder CSC TF crate running in EIC

14 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 14 CSC Trigger in MTCC, 904 TF Crate NIM logic FED Crate EMU TTC Crate MPC patch panel TF Crate peripheral Crate Green Barracks: TTC Crate Electronics Integration Center: MTCC trigger is up & running!

15 W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 15 CSC, RCT in MTCC: recent news CSC: CSC triggers have been successfully synchronized with the drift tube triggers and provided triggers for HCAL. RCT: Crate Fully Operational in Green Barracks at Point 5 Cable connections made to HCAL Full modules above and below connected Allows for top-bottom coincidence Here put picture of RCT crate in GB