Download presentation
Presentation is loading. Please wait.
Published byDwain Shields Modified over 9 years ago
2
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Rx Calorimeters (LAr, Tile) 0.2x0.2 0.1x0.1 400 Mb/s analogue ~75m 0.1x0.1 RoI Builder L1 CTP PreProcessor Timing alignment 10-bit FADC FIR filter BCID LUT Sum 2x2 BC-MUX PreProcessor Timing alignment 10-bit FADC FIR filter BCID LUT Sum 2x2 BC-MUX Jet/Energy Processor Sum Em+Had Jet/Energy Processor Sum Em+Had Jet identification Threshold count E T Ex, Ey E T, E T Cluster Processor RoI identification e/ / classification Threshold count Cluster Processor RoI identification e/ / classification Threshold count DAQ
3
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Processing Result counting PPM 0 PPM 1 PPM 2 PPM 3 CP M0 CPM 1 CPM 2 CP M3 Algorithms based on overlapping windows e/ / E T cluster + isolation Crates & modules processes quadrants
4
Alan Watson ATLAS Overview week, Prague, 17/09/2003
5
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Input Output
6
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Towers Jet sum ASIC FADCs LVDS 4 delay
7
Alan Watson ATLAS Overview week, Prague, 17/09/2003
8
Alan Watson ATLAS Overview week, Prague, 17/09/2003
9
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Tests with 2 CPMs LVDS data sources LVDS data input
10
Alan Watson ATLAS Overview week, Prague, 17/09/2003
11
Alan Watson ATLAS Overview week, Prague, 17/09/2003
12
Alan Watson ATLAS Overview week, Prague, 17/09/2003 Custom Backplane: Common design for CP and JE systems
13
Alan Watson ATLAS Overview week, Prague, 17/09/2003
14
Alan Watson ATLAS Overview week, Prague, 17/09/2003
15
Alan Watson ATLAS Overview week, Prague, 17/09/2003
16
Alan Watson ATLAS Overview week, Prague, 17/09/2003
17
Alan Watson ATLAS Overview week, Prague, 17/09/2003
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.