1
Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010
2
Introduction Problem description Design a simplified Mars Rover for a low-cost exploration to map a portion of the Martian surface and report on the presence of certain mineral deposits. The system is composed of three separate elements: A mission control based on earth A rover base based on Mars Multiple, physically identical, rovers that will be deployed to map the Martian surface and gather information on mineral deposits
3
Outline Mission Control package Rover Base package Rover package Comments, Questions, Issues
4
Mission control package
5
Mission Control package Context Diagram Use case diagram
6
Mission Control package Upload mission plan
7
Mission Control package Receive consolidated report
8
Mission Control package Request on-site imagery
9
Rover Base package
10
Static class diagram
11
Rover Base package Context diagram Use case diagram
12
Rover Base package Receive mission plan
13
Rover Base package Process periodic rover reports
14
Rover Base package Send consolidated report
15
Rover Base package Capture panoramic image
16
Rover package
17
Static class diagram
18
Rover package Context diagram Use case diagram
19
Rover package Rover receive plan
20
Rover package Goto initial position
21
Rover package Traverse planned path
22
Rover package Execute mapping plan
23
Construct mineral map
24
Rover package Transmit report
25
Rover package Avoid obstacle
26
Rover package Execute fail-safe plan
27
Comments, Questions, Issues
28
Comments Assumptions Rover is aware of its own current location Rover has some memory indicator that triggers with capacity reaches 80%
29
Comments, Questions, Issues Questions Can there be sequence diagrams without a use case?
30
Comments, Questions, Issues Issues Papyrus does not preserve look after save and reopen