Injector De-cabling Project Enlarged meeting #3 18.09.2015 E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.

Similar presentations


Presentation on theme: "Injector De-cabling Project Enlarged meeting #3 18.09.2015 E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team."— Presentation transcript:

1 Injector De-cabling Project Enlarged meeting #3 18.09.2015 E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team

2 Content Status by machine Follow-up on Booster Decision making on partial/full removal in Booster YETS organization Conclusions

3 Status by machine Machine/areaTotal number of signal and control cables (Excluding DC and not known cables) Identified obsolete cables (with or without purple tape) Last talk Booster12’0002’694 (23%) 25 % SPS – BA5~ 6’5003’250 (50%) 50 % SPS – BA3~ 8’0000 0 % PS – CENTRE RING~7’000963 (14%) 14 % TT2~3’00072 (2.5%) 2 % Reminder: cables which are in use now and are targeted to be replaced for future projects are not considered today as obsolete cables. They are out of the scope of this project and must be treated by the future project teams.

4 EN-EL ~500 cables analysés 1-Câbles signaux et contrôles : Cablothèque papier : 112.501112.700Emergency stop 96  being investigated by H. de Maynard https://edms.cern.ch/file/1220061/1/112501-112700.pdfhttps://edms.cern.ch/file/1220061/1/112501-112700.pdf 112.801113.000General 20  being investigated by S. Delarue https://edms.cern.ch/file/1220080/1/112801-113000.pdfhttps://edms.cern.ch/file/1220080/1/112801-113000.pdf Câblothèque Gesmar: voir fichier EN-EL attaché  212 cables (TE-EPC) tous en utilisation 2-câbles BT : voir fichier EN-EL_BT Analyse par S. Delarue : 3 câbles obsolètes, le reste en utilisation

5 BE-BI La DEC BI comporte maintenant 349 câbles Pour ce qui est des câbles utilisés, je n’ai pas de liste de Franck Guy Guillot-Vignot, Jocelyn Tan, Jeroen Belleman, Marek Gasior, Franco Lenardon, qui sont tous responsables de racks au Booster. Le point positif c’est que actuellement j’ai les listes de câbles utilisés de 5 personnes sur 10

6 TE-VSC DEC completed, will not evolve Used cable list under investigation. Some TE-VSC cables are not listed in EN-EL database

7 EN-STI DEC with 7 cables. Gesmar list analysed : green = EN-STI and in use, yellow = other group (50 cables). Paper list : analysis in progress.

8 TE-ABT 553 cables were announced obsolete but only 222 are really obsolete, the remaining is still in use till LS2 (Current BI.DIS) A DEC must be edited with these 222 cables The case of the former BI.DIS is not yet defined: can we consider it as an obsolete system ?

9 IT-CS T+T boxes 118045 0361 ASC-01 274931 0037 R-009 378034 0037 R-021 478200 0037 R-003 575311 0037 R-001 672064 0037 R-019 775779 0037 R-008 878601 0037 R-023 978609 0037 R-006 1072490 0037 R-025 1172493 0037 R-027 1272607 0037 R-010 1378869 0037 R-011 1476182 0037 R-022 1573249 0037 R-002 1676456 0037 R-003 1770382 0361 1-EXT 1876871 0364 2-014 1977089 0361 1-000 2077090 0361 1-000 2177397 0037 R-005 2274090 0037 R-016 2377425 0037 R-020 2474506 0361 S-000 2574507 0361 S-000 2674508 0361 S-000 2774509 0361 S-000 2874510 0361 S-000 2974512 0361 1-000 3074513 0364 2-014 3174514 0361 1-000 3274515 0271 1-001

10 Dashboard 04/09/15 LocalisedUnlocalised PS BOOSTER (12397) SPS-BA3 (8000) SPS-BA5 (6500) PS-ring centre (7000) GroupIDENTIFIEDDECIDENTIFIEDDECIDENTIFIEDDECIDENTIFIEDDEC EN/EL EN/CV 78 EN/MEF 96 EN/STI 777 TE/MSC 272 TE/EPC 155 56 TE/VSC 102 277 TE/MPE 63 TE/ABT 47414477855 BE/RF 129 5 BE/BI 451 42 BE/CO 597 251230 IT/CS GS/ASE 47 16600 DGS/RP PH 23 OTHER 480 TOTAL288319893250732963885 %23%16%50%11%14%13 %

11 Dashboard 17/09/15 Localised Unlocalised PS BOOSTER (11943) SPS-BA3 (8000) SPS-BA5 (6500) PS-ring centre (7000) GroupIDENTIFIEDDECIR%IDENTIFIEDDECIDENTIFIEDDECIDENTIFIEDDEC EN/EL 380 EN/CV 0010078 EN/MEF 96 100 EN/STI 771007 TE/MSC 272 100 TE/EPC 155 9556 TE/VSC 102 50277 TE/MPE 63 100 TE/ABT 4722247907855 BE/RF 129 1005 BE/BI 451(TBC) 4042 BE/CO 597 100251230 IT/CS 00100 GS/ASE 47 9016600 DGS/RP 00100 PH 23 100 OTHER 480? TOTAL269419893250732963885 %23%17%50%11%14%13 %

12 Partial/full removal CriteriaPartial removalFull removal + re- installation Cost--- Feasibility--0 Resources--- Standard waste0- Activated waste--- Schedule--- Risk (damage)--- Outcome--- Prix [MCHF] Temps [W], work in 2shifts Depose total1.512 Repose4.250 Depose partial0.823 Preliminary study

13 YETS organization Lock-out of all services during identification and cable disconnection  in conflict with some systems  Identification and cable disconnection (YETS 2015) under the responsibility of the equipment group  Up to the equipment group to decide for the lock-out of its equipment  Working teams will need the adequate electrical accreditation  Removal of the obsolete cables (EYETS 2016- 2017) under the responsibility of EN-EL  general lock-out is mandatory.

14 YETS organization Re-commissioning after disconnection/removal – Common procedure  a dedicated sub-WG will be launched soon. Will address the following topics: Procedure for already disconnected cable Procedure for not yet disconnected cable Procedure for orphan cable List of tests to be achieved after disconnection

15 YETS organization YETS 2015/2016 Booster = 9 weeks available / SPS = 7 weeks available : Circuit lockout Cable identification Cable disconnection System tests

16 YETS organization Current proposal: Circuit lockout: 1-2 days Cable identification and disconnection for separate systems. 2 weeks in 2 shifts Check of separate systems: 2 weeks in 2 shifts Cable identification and disconnection for communication system: 2 weeks in 2 shifts Check communication system : 1 week in 2 shifts Co-activities during YETS and EYETS > Schedule to be prepared Tight schedule for BA3 & BA5 Operators might help.

17 Project Information Sharing E-groups InjectorDe-CablingProjectMembers (members of the Injector De-Cabling Project (equipment group)) InjectorDe-cablingProjectTeam (Project team for de-cabling activities in the injectors) Indico https://indico.cern.ch/category/6591/ Sharepoint site https://espace2013.cern.ch/Injector-De-Cabling-Project/_layouts/15/start.aspx#/

18 Conclusions Booster: an exhaustive approach is followed. Each listed cable is being analyzed by group owner/user (  Obsolete cables + Used cables). Almost complete! Results: Paper listings contain more obsolete cables than Gesmar A lot of cables seems already removed, although they are still listed in DB. Used/unused ratio varies very much, depending on the equipment groups considered Only 25 % obsolete cables were identified up to now, this result will not evolve any longer and should be considered as final. The same methodology will be applied on SPS and PS.

19