Team 1-B In association with National Weather Service: Radar Operations Center Presents WSR-88D Pedestal Simulator Final Demonstration.

Similar presentations


Presentation on theme: "Team 1-B In association with National Weather Service: Radar Operations Center Presents WSR-88D Pedestal Simulator Final Demonstration."— Presentation transcript:

1 Team 1-B In association with National Weather Service: Radar Operations Center Presents WSR-88D Pedestal Simulator Final Demonstration

2 Team 1-B Gary Mobley – Configuration Manager Jonathan Moore - Project Manager Brian McCall – Correspondence Officer Usman Chughtai – Financial Officer

3 Requirements Accurate pedestal response –Achieved Softcopy of firmware –Provided Documentation –Provided Demonstration –Provided

4 Response Requirements System characteristics for step input: –Slightly underdamped response –Rise time ≤ 1 second –Percent Overshoot ≤ 10% –Settling time (±2%) ≤ 1.5 seconds –Steady state error ≤ 20%

5 Comm. Requirements Update position every 45 ms Must appear transparent to Open Radar Data Acquisition shelter

6 Product Description Pedestal Simulator runs on 68HC11 chip Simulates DCU and Pedestal Communicates serially with ORDA

7 Functional Block Diagram MAIN XMIT CALC ORDA Pedestal Simulator Microprocessor SCIR Serial Port

8 Key Features Commands Step Response Rate limits Elevation position limits Models pedestal response with second-order approximation

9 Difference Equation y[n] = y[n-1] + 0.7634 (y[n-1] – y[n-2]) + 0.037 (x[n-1] – y[n-1]) wherex[n-1] is DESIRED POSITION y[n-2] is OLD POSITION y[n-1] is CURRENT POSITION y[n] is NEW POSITION Multiplication subroutine built to handle both unsigned and signed multiplication.

10 Performance Highlights Tr 0.45s Ts 1.31s Overshoot 6.58% SSE 0.2%

11 Performance Highlights Tr 0.45s Overshoot 6.66% SSE 0.2% Ts 1.31s

12 Parts Cost ItemUnit PriceQty.Price Microprocessor chip MC68HC711E9CFN2 $10.501 PLCC IC Extractor$3.951 RS-232 Cable 6’ DB9M-DB9F $4.491 Total$18.94

13 Labor Cost Effective Hourly Rate: $44.7/hr Budgeted Hours for Project Completion 278 hrs Total Budget Cost $12,363 Actual Hours to Complete 231 hrs Total Actual Cost $10,273 Percent Expended 83%

14 The Schedule

15 Recommendations Custom PC Board Diagnostics LCD Display –Status –Error Codes

16 Test Environment Hardware Software

17 Tests Azimuth –Small/Large Step –+/- Rate –Max/Min Rate –Wrap Around Elevation –Small/Large Step –+/- Rate –Max/Min Rate –Max/Min Position

18 Demonstration