Download presentation
Presentation is loading. Please wait.
Published byAmice Marshall Modified over 9 years ago
1
Team Organization Captains – Chris Chaffee + David Hall Project Management – Will Lupher + Backup Logistics (Materials Acquisition, Stockpiling) – Lead + Backup Finance (Fundraising) – Lead + Backup Accounting (Expense Tracking) – Lead + Backup
2
Team Organization Accounting (Expense Tracking) – Lead + Backup Scheduling (Task List Building) – Lead + Backup Quality Assurance (Checklist Building, Verify Completion) – Lead + Backup Documentation (Report, Engineer’s Notebook) – Lead + Backup Physical Training (Paddling Practice, Race Day Team Selections) – Lead + Backup
3
Task List Report – Lead + Backup Analysis – Lead + Backup Display Table – Lead + Backup Presentation – Lead + Backup Paddling Practice – Lead + Backup Form Construction – Lead + Backup Concrete Mix Design – Lead + Backup
4
Task List (continued) Concrete Mixing (Placement Day) – Lead + Backup QA/QC (Placement Day) – Lead + Backup Mesh Layout (Placement Day) – Lead + Backup Tension Wire (Placement Day) – Lead + Backup Curing Tent (Placement Day) – Lead + Backup Humidifiers (Placement Day) Lead + Backup Shop Clean-Up (Placement Day) – Lead + Backup
5
Task List (continued) Mold Removal – Lead + Backup Canoe Finishing – Lead + Backup Canoe Stand Construction – Lead + Backup Water Safety – Lead + Backup Rapid Repair Team – Lead + Backup Transport Team Lead + Backup TBD – Lead + Backup
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.