Presentation is loading. Please wait.

Presentation is loading. Please wait.

2009 IPC Energy Benchmarking Survey Initial Results Survey of 2008 operations.

Similar presentations


Presentation on theme: "2009 IPC Energy Benchmarking Survey Initial Results Survey of 2008 operations."— Presentation transcript:

1 2009 IPC Energy Benchmarking Survey Initial Results Survey of 2008 operations

2 IPC Energy Benchmarking Survey Respondents 2008 31 Facilities –5 Component –10 EMS/OEM –5 EMS/Component –1 EMS/PCB –8 PCB –2 Other 9 Companies 2009 15 Facilities –1 Component –6 EMS/OEM –0 EMS/Comp –0 EMS/PCB –8 PCB –0 Other ? Companies

3 IPC Energy Benchmarking Survey Respondents 2008 31 Facilities –29,254 Employees –$3.8B Sales –6.9M Bldg Ft2 –26.47M LSFS –62.7M PCBAs –2.5B Components 1.6Q BTUs –$40.3M Cost 2009 15 Facilities –7,165 Employees –$1.08B Sales –2.2M Bldg Ft2 –52.2M LSFS –1.29M PCBAs –11K Instruments 2.8Q BTUs –$10.3M Cost

4 IPC Energy Benchmarking Survey Respondents 20072008 Monitor Usage10 of 3112 of 15 Monitor E Cost10 of 3113 of 15 14001 Certified? 5 of 3113 of 15 Implemented E Reduction Projs? 5 of 316 of 15 Implementing E Reductions? 6 of 316 of 15

5 IPC Energy Benchmarking Survey Respondents 20072008 Variable Speed Motors4 of 317 of 15 Compressor Unloaders4 of 317 of 15 Equip. Time Controls5 of 3110 of 15 Waste heat exchangers? 1 of 312 of 15 WW Heat Exchangers? 0 of 311 of 15 High Efficiency Lights? 9 of 319 of 15

6 IPC Energy Benchmarking Survey Respondents 20072008 Energy Survey?4 of 31? of 15 By Electric Utility3 of 314 of 15 By Gas Utility3 of 313 of 15 By E Consultant4 of 316 of 15 By Gov’t Assist Off.2 of 312 of 15

7

8

9

10 EMS/OEM Manufacturers Comparison of Energy Usage Per Employee and per PCB Populated

11

12

13 PCB Manufacturers Comparison of Energy Usage Per Employee and LSFS Processed

14

15


Download ppt "2009 IPC Energy Benchmarking Survey Initial Results Survey of 2008 operations."

Similar presentations


Ads by Google