ECE 4501 Electric Power Generation OVERVIEW
2
BOSWELL ENERGY CTR Minnesota Power’s Primay Generation Ceneter (an Allete Company!) Unit 1, 70 megawatts, operational in 1958. Unit 2, 70 megawatts, operational in 1960. Unit 3, 350 megawatts, operational in 1973. Unit 4, 535 megawatts, operational in 1980.
3
Boswell from the Air
4
Power Station
5
Boiler www.babcock.com
6
Steam Turbine/Generator
7
High Voltage Transmission preservationnation.org
8
Turbine
9
Synchronous Generator Howstuffworks.com
10
Stator – Liquid Cooled Windings
11
Step-Up Transformer ABBpowerservices.com
12
Transmission Lines www.brics-info.org
13
Substation www.osha.gov
14
Distribution Lines www.dom.com