Presentation is loading. Please wait.

Presentation is loading. Please wait.

PLANET Codes  MTAC. Confirm Reports Delivery vs. Service Goal –Released - October 19 th –Speed – Less than 1 minute; no time-outs –Data – 90 days –Separate.

Similar presentations


Presentation on theme: "PLANET Codes  MTAC. Confirm Reports Delivery vs. Service Goal –Released - October 19 th –Speed – Less than 1 minute; no time-outs –Data – 90 days –Separate."— Presentation transcript:

1 PLANET Codes  MTAC

2 Confirm Reports Delivery vs. Service Goal –Released - October 19 th –Speed – Less than 1 minute; no time-outs –Data – 90 days –Separate Report – First-Class and Standard In-Home –Currently testing; release mid- November Redesign Shared Service Performance

3 Delivery vs. Service Goal Report Old Report Run time- September Minutes

4 Delivery vs. Service Goal Report New Report Run time- September Seconds

5 Confirm Reports Delivery vs. Service Goal –Released - October 19 th –Speed – Less than 1 minute; no time-outs –Data – 90 days –Separate Report – First-Class and Standard In-Home –Currently testing; release mid- November Redesign Shared Service Performance

6 Confirm Certification Current Certification Process Re-evaluating changes Test certifications completed in November Revisions, if needed Open to all subscribers – Early February Revisions


Download ppt "PLANET Codes  MTAC. Confirm Reports Delivery vs. Service Goal –Released - October 19 th –Speed – Less than 1 minute; no time-outs –Data – 90 days –Separate."

Similar presentations


Ads by Google