1 УПРАВЛЯЮЩАЯ КОМПАНИЯ Moscow 2010

2 УПРАВЛЯЮЩАЯ КОМПАНИЯ UEC Companies Perm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC MPP «Motor» Ufa Engine Industrial Association JSC Kuznetsov JSC, N.D Kuznetsov STCS Klimov JSC Chernyshev MMBE JSC

3 УПРАВЛЯЮЩАЯ КОМПАНИЯ UEC Gas Turbines Manufacturing CompanyGT TypePower Output, MWeInitial Engine Perm Motors JSC GTU-2,5P2,56 D-30 GTU-4P4,13 GTU-6P6,14 GTU-12PG-212,3 PS-90А GTE-16PA16,3 GTU-16PA216,4 GTU-25P23,0 NPO "Saturn" JSC, Saturn - Gas Turbines JSC DO-492,85- GTD-6RM6,5 D-30KU/КP GTD-8RM8,56 GTD-10RM10,0 GTD-110110,0- MPP «Motor» Ufa Engine Industrial Association JSC GTP-10/9538,2R-13 AL-31CTE18AL-31F Kuznetsov JSC, N.D Kuznetsov STCS NK-14EBR10,5NK-12MP NK-37ST26,5NK-32 Klimov JSCGTP-1,251,329TVЗ-117 Chernyshev MMBE JSCGTP-55ST-2020,0R-29-300

4 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 1,25 MW output  ManufacturerKlimov JSC  GT Type GTP-1,25  Power Output, (MWe) 1,329  LHV Efficiency, %25,0  Exhaust heat, Гкал/ч2,0  Heat Effisiency Rate, %68,7  Total GT in operation 3  Overall operating time, h26 500 GTP-1,25 ISO Conditions Fuel - Natural Gas

5 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 1,25 MW output Reference GT ManufacturerCustomerLocationAmount Commercial Operation Klimov JSC OOO Lucoil-Sever Ardalin field (Arkhangelsk region) 12001 Kronstadt PlantSt. Petersburg22004 Total GT in operation3 Overall operating time, h26 500

6 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 2,5 MW output  ManufacturerPerm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC  GT Type ГТУ-2,5ПДО 49  Power Output, (MWe) 2,562,85  LHV Efficiency, %21,1228,5  Exhaust heat, Гкал/ч5,823,9  Heat Effisiency Rate, %76,974  Total GT in operation 133 * 28  Overall operating time, h2 469 744159 554 GTU-2,5PDO 49 ISO Conditions Fuel - Natural Gas * Including GT in reserve and under repair

7 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 2,5 MW output applications Perm motors JSC SCPP «Ural-2500», Uralskoe Gas Boosting Station ООО Gazprom Transgaz Yugorsk(2007) Perm motors JSC SCPP «Ural-2500», Sosvinskoe Gas Boosting Station ООО Gazprom Transgaz Yugorsk (2005) NPO «Saturn» JSC SCPP GTES-2,5 Gas Boosting Station Salskaya ООО Gazprom transgaz Stavropol (2003) NPO «Saturn» JSC SCPP GTES-2,5 Gas Boosting Station Pestsovoye ООО Gazprom dobycha Urengoy (2006) NPO «Saturn» JSC SCPP GTES-2,5 Gas Boosting Station Harvutinskoye ООО Gazprom dobycha Yambur (2007) Perm motors JSC SCPP «Ural-2500», Gas Boosting Station Yubileynaya, ООО «Gazprom dobycha Nadym» (2004)

8 УПРАВЛЯЮЩАЯ КОМПАНИЯ GT ManufacturerCustomerLocationAmountCommercial Operation Perm Motors JSC ОАО «Kompania YUG»Igrim61994 ООО “Gazprom Transgaz Yugorsk" Yamburgskoe GBS71997 Nydinskoe GBS61997 N. Urengoyskoe GBS22004 GBS Yagelnoe31999 GBS Priozernoe32000 Long-Yuganskkoe GBS32000 Pravokhettinskoe GBS32000 Nalymskoe GBS32001 Sorumskoe GBS41997 Sosnovskoe GBS41999 Kazymskoe GBS51997 Bobrovskoe GBS31998 Verhnekazymskoe GBS41998 Oktyabrskoe GBS41996 Peregrebnenskoe GBS41996 Uralskoe GBS81996 Sosvinskoe GBS62005 Puntinskoe GBS31999 Komsomolskoe GBS12001 Krasnoturyinsk1in reserve GBS Pangody42007 ООО “Burenergo"Noviy Urengoy52000 ООО " Gazprom Transgaz Ukhta"Urdomskoe GBS42000 ООО " Gazprom Dobycha Nadym" Yamsoveyskiy GBS72002 GBS Yubileynaya62004 Kharasaveyskaya GBS4balancing and commissioning Yamalskoe GBS5balancing and commissioning ООО " Gazprom Transgaz Yamburg"Novozapolyarniy82001 Total GT in operation126 Overall operating time, h2 469 744 Gas Turbines 2,5 MW output Reference

9 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 2,5 MW output Reference GT ManufacturerCustomerLocationAmountCommercial Operation NPO "Saturn" JSC, Saturn - Gas Turbines JSC ООО “Gazrom Transgaz Stavropol" GBS Salskaya22003 ООО “Gazprom UGS" Kasinovskoe UGS3 2 units in 2006 1 unit in 2007 ООО “Gazprom Dobycha Urengoy" GBS Pestsovoe62006 ООО “Gazprom Transgaz Nizhniy Novgorod" GBS Yavasskaya22007 ООО “Gazprom Dobycha Yamburg" GBS Kharvutinskoe42007 ООО “Gazprom Transgaz Ukhta" GBS Yubileynaya3 delivered in 2008 GBS Nyuksenica3 JSC NPO «Saturn»Rybinsk11999 ZAO «Volgograd Bearing Factory» Vologda2delivered in 2001 OOO NOVATEK- Yurkharovneftegas Nadym, (Yurkharovskoye field) 12006 ОАО Oil and Gas Company «RussNeft» Batovo, (Nizhne- Shapshinskoe field) 12007 Total GT in operation 28 Overall operating time, h 159 554

10 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 4 MW output  ManufacturerPerm Motors JSC  GT Type GTU-4P  Power Output, (MWe) 4,13  LHV Efficiency, %24  Exhaust heat, Гкал/ч8,3  Heat Effisiency Rate, %80,2  Total GT in operation 35 *  Overall operating time, h962 180 GTU-4P ISO Conditions Fuel - Natural Gas * Including GT in reserve and under repair

11 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 4 MW output applications Perm Motors JSC SCPP «Ural-4000» SCHPP «Agidel» ООО «Bashkirskaya Generiruyuschaya kompaniya» (1997) Perm Motors JSC SCPP «Ural-4000» Gastello vill., Sakhalin-Energy (commissioning) Perm Motors JSC SCPP «Ural-4000», SSHPP «Shigili», ОАО «Bashkirenergo» (1997)

12 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 4 MW output Reference GT ManufacturerCustomerLocationAmountCommercial Operation Perm Motors JSC Surgutneftegas OJSCKonitlor62001 ООО «Lukoil – Zapadnaya Sibir» S.-Gubkinskoe field22001 ООО «Gazprom Transgaz Ekaterinburg» Sysert11999 Aramil12006 Storage base1in reserve ООО «Bashkirskaya Generiruyuschaya kompaniya» Bolsheustikinskoe12000 Agidel22002 Electronic Solar S.R.L.Adria (Italy)2 balancing and commissioning ООО Gazprom Transgaz Ukhta Vuktyl3 balancing and commissioning Perm Motors JSCPerm11997 PGPZ JSC, ZAO Sibur- Khimprom Perm (Osentsy vill.)11999 ООО «Yung- Energoneft» Neftyugansk62002 NPO «Iskra»Neftyugansk12003 Sakhalin-EnergyGastello (Sakhalin-2)3 balancing and commissioning Total GT in operation31 Overall operating time, h962 180

13 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 6 MW output  ManufacturerPerm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC  GT Type GTU – 6PGTD – 6RM  Power Output, (MWe) 6,146,5  LHV Efficiency, %26,1925  Exhaust heat, Гкал/ч11,4412,4  Heat Effisiency Rate, %82,980,5  Total GT in operation 1938  Overall operating time, h99 480548 524 GTU – 6PGTD – 6RM ISO Conditions Fuel - Natural Gas

14 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 6 MW output applications Perm Motors JSC SCPP «Ural-6000» SCHPP Severo-Gubkinskoe field ООО «Lukoil – Zapadnaya Sibir» (2006) Perm Motors JSC SCPP «Ural-6000» SCHPP Ivanovo JSC «TGC-6» Ivanovsky Branch (2004) Perm Motors JSC SCPP «Ural-6000» SCHPP Solikamsk для JSC Silvinit (2007) NPO «Saturn» JSC GTA-6RM DHS Penyagino Moscow Moscow energy efficiency agency (2006г.) NPO «Saturn» JSC GTA-6RM DHS Kuryanova Moscow Moscow energy efficiency agency (2005) NPO «Saturn» JSC GTA-6RM DHS Peredelkino Moscow Moscow energy efficiency agency (2005)

15 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 6 MW output Reference GT ManufacturerCustomerLocationAmountCommercial Operation Perm Motors JSC Perm12002 TGC-6 JSC Ivanovsky Branch Ivanovo22004 OOO “Lukoil – Zapadnaya Sibir" Severo-Gubkinskoe field12007 Zvenigorod maintenance and utilities board Zvenigorod3assembling Silvinit JSCSolikamsk22007 OOO “Lukoil – Zapadnaya Sibir" Pyakyakhinskoe field4shipping OOO "Burgas"Bovanenkovskoe field6shipping Total GT in operation19 Overall operating time, h99 480

16 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 6 MW output Reference GT ManufacturerCustomerLocationAmountCommercial Operation NPO "Saturn" JSC, Saturn - Gas Turbines JSC NPO "Saturn" JSCRybinsk22002 ZAO KhimtrastOmsk22003 ГУП «Централизованный стройзаказчик администрации Ненецкого автономного округа» Haryan-Mar 22003 3delivered in 2008 (assembling) «Sever-TEK» CJSC Usinsk (Yuzhno-Shapkino field) 42003 ООО «Lukoil-Komi»1 2008 balancing and commissioning Mikhaylovka AdministrationMikhaylovka, Volgograd region2delivered in 2003 Cotton concern «Rodniki Textil»Rodniki2delivered in 2007 Moscow energy efficiency agency Moscow (DHS Kuryanovo) 22005 Moscow (DHS Penyagino) 22006 Moscow (DHS Peredelkino) 22005 Zelenograd22006 Smolenskenergo JSCDorogobuzh22005 Surgutneftegas OJSC Surgut (Tromyeganskoe field) 22007 Surgut (Zapadno-Chigorinskoe field) 22008 Surgut (Verkhne-Nadymskoe field) 42008 Tomskneft OJSCIgolsko-Talovoe field2delivered in 2009 (assembling) Total GT in operation38 Overall operating time, h548 524

17 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 8 MW output  Manufacturer MPP «Motor», Ufa Engine Industrial Association JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC  GT Type GTP-10/953GTD-8RM  Power Output, (MWe) 8,28,56  LHV Efficiency, %2625,8  Exhaust heat, Гкал/ч15,616,6  Heat Effisiency Rate, %83,584  Total GT in operation 50  Overall operating time, h41 2000 GTP-10/953GTD-8RM ISO Conditions Fuel - Natural Gas

18 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 8 MW output applications MPP «Motor», Ufa Engine Industrial Association JSC GTP-10/953 boiler department №4 Ufa, JSC Bashkirenergo (2005) MPP «Motor», Ufa Engine Industrial Association JSC GTP-10/953 boiler department №4 Ishimbay, JSC Bashkirenergo (2002г.) MPP «Motor», Ufa Engine Industrial Association JSC GTP-10/953, SUAE farm Alekseevskiy, Ufa region Minstroy RB, (2008)

19 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 8 MW output Reference GT ManufacturerCustomerLocationAmount Commercial Operation MPP «Motor», Ufa Engine Industrial Association JSC JSC Bashkirenergo boiler department №5 Ishimbay 12002 JSC Bashkirenergo boiler department №4 Ufa 12005 Minstroy RB SUAE farm Alekseevskiy, Ufa region 12008 Mosenergo Pavlovskiy Posad, Moscow region 2 balancing and commissioning finished in 2008 Total GT in operation5 Overall operating time, h41 200

20 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 10 MW output  Manufacturer Kuznetsov JSC, N.D Kuznetsov STCS NPO "Saturn“ JSC, Saturn - Gas Turbines JSC  GT Type NK-14EBRGTD-10RM  Power Output, (MWe) 10,5  LHV Efficiency, %33,027  Exhaust heat, Гкал/ч11,216,9  Heat Effisiency Rate, %7477,5  Total GT in operation 20  Overall operating time, h3550 NK-14EBRGTD-10RM ISO Conditions Fuel - Natural Gas

21 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 10 MW output applications Kuznetsov JSC, N.D Kuznetsov STCS NK-14 EBR, Mednogorsk JSC Orenburgenergo (balancing and commissioning)

22 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 10 MW output Reference GT ManufacturerCustomerLocationAmount Commercial Operation Kuznetsov JSC, N.D Kuznetsov STCS Orenburgenergo JSCMednogorsk1 balancing and commissioning Gazprom JSCSamara1 balancing and commissioning Total GT in operation 2 Overall operating time, h 355

23 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 12 MW output  ManufacturerPerm Motors JSC  GT Type GTU-12PG-2  Power Output, (MWe) 12,3  LHV Efficiency, %32,6  Exhaust heat, Гкал/ч16,6  Heat Effisiency Rate, %83,7  Total GT in operation 34 *  Overall operating time, h549 034 GTU-12PG-2 ISO Conditions Fuel - Natural Gas * Including GT in reserve and under repair

24 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 12 MW output applications Perm Motors JSC SCPP EGES-12S Bittemskoe field, OJSC Surgutneftegas (2004) Perm Motors JSC SCPP EGES-12S на Vatyeganskoe field, ООО «Lukoil – Zapadnaya Sibir» (2008) Perm Motors JSC SCPP EGES-12S Lukyavinskoe field, OJSC Surgutneftegas (2004)

25 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 12 MW output Reference GT ManufacturerCustomerLocationAmount Commercial Operation Perm Motors JSC Surgutneftegas OJSC Lukyavinskaya SCPP-3632004 Russinskaya SCPP-2422004 Bittemskaya SCPP-3632004 Lyantorskaya SCPP-2422004 Lyanrorckaya SCPP-3632004 ООО «Lukoil – Zapadnaya Sibir» Vatyeganskoe fied62008 Tevlinsko-Rusinskoe field42009 TMP «Pokachevneftegas»4shipping ООО «Gazpromneft Khantos» Yuzhno-Priobskoe fied4shipping Total GT in operation31 Overall operating time, h549 034

26 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 16-18 MW output  ManufacturerPerm Motors JSC MPP «Motor», Ufa Engine Industrial Association JSC  GT Type GTE-16PAAL-31STE  Power Output, (MWe) 16,318  LHV Efficiency, %35,536  Exhaust heat, Гкал/ч19,3520,6  Heat Effisiency Rate, %84,483,9  Total GT in operation 2 2*2*  Overall operating time, h00 GTE-16PA ISO Conditions Fuel - Natural Gas AL-31CTE * Including GT in reserve

27 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 16-18 MW output applications Perm Motors JSC SCPP GTES-16PA, HPS-13 Perm CJSC «Ies-Holdingг» (balancing and commissioning) MPP «Motor», Ufa Engine Industrial Association JSC GTE-18 «Ufa», Ufa Ufa Engine Industrial Association JSC (balancing and commissioning)

28 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 16-18 MW output Reference GT ManufacturerCustomerLocationAmount Commercial Operation Perm Motors JSC JSC TGC-9HPS-13, Perm1 balancing and commissioning ООО «Bashkirskaya Generiruyuschaya kompaniya» JSC Bashkirenego1shipping Total GT in operation2 Overall operating time, h0 MPP «Motor», Ufa Engine Industrial Association JSC Ufa1 balancing and commissioning Total GT in operation1 Overall operating time, h0

29 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 20-25 MW output  Manufacturer Chernyshev MMBE JSC Perm Motors JSC Kuznetsov JSC, N.D Kuznetsov STCS  GT Type GTP-55SТ-20GTE-25PNK-37ST  Power Output, (MWe) 2023,026,5  LHV Efficiency, %30,736,6536,4  Exhaust heat, Гкал/ч3026,1028,5  Heat Effisiency Rate, %84,28582,0  Total GT in operation 414  Overall operating time, h99 530067 372 GTE 25PNK-37STGTP-55ST-20 ISO Conditions Fuel - Natural Gas

30 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 20-25 MW output applications Perm Motors JSC SCPP GTES-25P, Ufa ООО «Bashkirskaya Generiruyuschaya kompaniya» (2009) Kuznetsov JSC, N.D Kuznetsov STCS SCPP NK-900E, Kazan JSC Tatenergo (2006) Chernyshev MMBE JSC GTP-55ST-20, Novopolotsk, Belarus JSC Naftan (1999) Kuznetsov JSC, N.D Kuznetsov STCS SCPP NK-900E, Samara JSC Samaraenergo (1999)

31 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 20-25 MW output Reference GT ManufacturerCustomerLocationAmountCommercial Operation Chernyshev MMBE JSC JSC Naftan Novopolotsk, Belarus 21999 ChernishevMoscow2 Predicted startup in 2009 Total GT in operation4 Overall operating time, h99530 Perm Motors JSC JSC BashkirenergoUfa ТЭЦ-11assembling Total GT in operation1 Overall operating time, h0 Kuznetsov JSC, N.D Kuznetsov STCS JSC SamaraenergoSamara11999 JSC TatenergoKazan22006 JSC GrodnoenergoLida12008 Total GT in operation4 Overall operating time, h67 372

32 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 110 MW output  Manufacturer NPO "Saturn"JSC, Saturn - Gas Turbines JSC  GT Type GTD-110  Power Output, (MWe) 110  LHV Efficiency, %35  Exhaust heat, Гкал/ч118,7  Heat Effisiency Rate, %78,9  Total GT in operation 53  Overall operating time, h7  Manufacturer50 138 GTD-110 ISO Conditions Fuel - Natural Gas

33 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 110 MW output applications NPO "Saturn"JSC GTE-110 № 2, Komsomolsk, Ivanovo Region Testing unit for RAO UEC of Russia JSC (2001) NPO "Saturn"JSC GTE-110 № 3 и №4, Komsomolsk, Ivanovo region unit №1 Ivanovo CCPP Technopromexport JSC (2007) NPO "Saturn"JSC GTE-110 №6 и №7, Komsomolsk, Ivanovo region unit №2 Ivanovo CCPP Tecnopromexport JSC (building)

34 УПРАВЛЯЮЩАЯ КОМПАНИЯ Gas Turbines 110 MW output Reference GT ManufacturerCustomerLocationAmount Commercial Operation NPO "Saturn" JSC, Saturn - Gas Turbines JSC RAO UEC of Russia JSC Kaborga, Nikolaev region, Ukraine 11998 RAO UEC of Russia JSC Komsomolsk, Ivanovoregion Testing unit 12001 Technopromexport JSC Komsomolsk, Ivanovoregion unit №1 Ivanovo CCPP 22007 WGS-6 JSC SDPP-24 unit №7 Novomichurinsk, Ryazan region1building Inter RAO UEC JSC, Ivanovskie CCPP branch Komsomolsk, Ivanovoregion unit №2 Ivanovo CCPP 2building Total GT in operation7 Overall operating time, h50 138

35 УПРАВЛЯЮЩАЯ КОМПАНИЯ Service and support А. Standard product support: GT maintenance guidelines and advises; GT maintenance according operation guide. B. GT power stations maintenance: GT maintenance guidelines and advises; GT maintenance according operation guide; Performance of casual works on site (on customer call): troubleshooting, unit replacement etc.; Permanent expert presence for operating stuff consultation and operating issues prompt decision. C. Long-Term full technical support: GT maintenance guidelines and advises by phone 24 hours a day; Expert provision for troubleshooting, unit replacement etc.; GT maintenance according operation guide; Provision of spare parts kit for GT maintenance; GT and other machinery general maintenance; Permanent expert presence for operating stuff consultation and operating issues prompt decision ; Spare engine lease during main engine repair works.


Download ppt "УПРАВЛЯЮЩАЯ КОМПАНИЯ Moscow 2010. УПРАВЛЯЮЩАЯ КОМПАНИЯ UEC Companies Perm Motors JSC NPO "Saturn" JSC, Saturn - Gas Turbines JSC MPP «Motor» Ufa Engine."

Similar presentations


Ads by Google