Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader
2
Physics At CERN Protons extracted in point 4 of SPS. Pions & Kaons after Target. Muons Neutrinos after Decay Tunnel. At Gran Sasso Opera Detector. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC1
3
Horn and Reflector PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC2
4
Introduction Horn and Reflector (Load) 7 m long (approx.) 1.6 tonne (approx.) PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC3
5
4 Horn Picture
6
Electrical Circuit PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC6
7
UnitHORN SystemREFLECTOR System Load Peak currentkA150180 Transformer ratio1632 Primary current peakA93755625 Load inductanceµH2,7 X 16 X 16 = 6911,5 X 32 X 32 = 1540 Total inductance with 4 cablesµH12102046 Load resistance mm 0,6 X 16 X 16 = 1540,21 X 32 X 32 = 215 Total resistance with 4 cables mm 328495 Total capacitance for one pulseµF4080 Pulse durationms7,510 Charging voltageV77006300 Total stored energykJ2 X 119 = 2382 X 80 = 160 Load max. voltageV280150 Mean power dissipated by current only (2 pulses) kW1610,5 Total power dissipated (with beam)kW2616,5 Water flow for delta T=5Cl/min70 Pressurebar1,2 Electrical Parameters PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC5 HV Capa. Th. Disch. TR. Pulse
8
General View Horn and Reflector In Target Chamber Charging Power Supply in surface Power cables (~1000m) along Access Galleries Pulse Transformer In Service Gallery Strip Lines from Transformers to Horn & Reflector PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC7
9
Layout in BHA4 3 PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC8
10
Cross section in underground 4th NBI, 7 - 11 November 2003 at KEK by Gilles MAIRE9 Transformer Load
11
Charging Power Supply Old Electronic New Electronic AB/PO Group 24U 6U PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC10
12
Charging Power Supply Need to increase charging voltage to 10kV. Buy new transformer (LV/HV), call for tender for 3 units for a cost of 30kchf. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC11
13
Charging Power Supply Old New New HV Rectifier Diode Need to increase charging voltage. Call for tender for 30 units for a cost of 30kchf. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC12 Results Space saving. Number of diodes divided by 2.
14
Capacitors Discharge Rack with New capacitors New capacitors 12 racks with a total of 48 capacitors. Call for tender for a cost of 350kchf. Results Space saving. Number of racks divided by 3. Important cost saving (300kchf) for infrastructure and cabling. Rack with WANF capacitors PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC13
15
Discharge Circuit Old New New Inductance Call for tender for 12 units for a cost of 40kchf. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC14 Results Space saving. Number of inductance divided by 6.
16
Thyristor Switches (20kV, 18kA) New Th. Discharge All Th. Switches needed have been bought and delivered by ARCEL (FR). 6 units for 150 kchf. 3 thyristors in series, sharing resistor, RC snubber and impulse transformer. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC15
17
Pulse Transformers Pulse Transformer Reusing WANF Transformers ratio 32. Adaptation ratio 16 for Horn. Cost saving 450kchf. Ratio 16 PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC16
18
18kV Power Cables Power cables Call for tender for 6 X 1km (4X95mm2), have been bought and delivered by PIRELLI. Cost of 350kchf. 80kchf for laying. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC17
19
PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC18
20
Connection in BHA4 Junction in ECA4 Connection in TSG Electrical & Continuity Test 20th January 2006 18kV Power Cables Connection PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC19
21
Control Designed by Sylvain RAVAT EP/TA3 latigid PVSS Supervisor in BHA4 DISCHARGE CIRCUIT POWER CONVERTER Designed by Sylvain RAVAT EP/TA3 Control Room supervision VME, TG8, MIL1553, G64 POW protocol - CMW UNICOS CESAR Logging Alarms Horn’s interlocks Interlocks Ethernet Network EARTH & POLARITY Interlocks REMOTE I/O FIP Bus Surface BHA4Underground PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC20
22
Control in Surface (BHA4) PLC Rack in BHA4 Schneider Unity. UNICOS. Programming Process. Hardware interlocks. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC21
23
Control in Underground Remote I/O in TSG Instrumentation of Cooling Unit in TSG FIP I/O and conditioning signal. Cooling Unit. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC22
24
PVSS Electrical View Designed by Sylvain RAVAT EP/TA3 PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC23
25
PVSS Hydraulic View Designed by Sylvain RAVAT EP/TA3 PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC24
26
Hydraulic View Designed by Sylvain RAVAT EP/TA3 Trending. Historical. Alarm. PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC25
27
Commissioning in May 2006 Designed by Sylvain RAVAT EP/TA3 50ms 150kA 180kA 50ms Double pulse for Horn. Time pulse of 6,5ms conform with simulation Double pulse for Reflector. Time pulse of 10ms conform with simulation PH/DT1 Group Meeting, 23 October2007 by Gilles MAIRE PH/DT1-IC26