Download presentation
Presentation is loading. Please wait.
Published byAshlyn Mathews Modified over 9 years ago
1
Cost of Safety CTC-415
2
Accidents Costs –Increased Worker’s Comp rates –Increased health insurance rates –OSHA fines & remediation –Legal fees –Negligence payments –Gaetano Const – dropped 1/3 of WC rate with improved safety
3
Safety costs OSHA site visits –Fines possible –More visits with higher accident rate Safety Meetings –On site Usually weekly or monthly depending on craft All members of craft on site Also general safety meetings w/ everyone
4
Safety costs Site must have emergency shower, eyewash, first aid kits
5
Safety Costs Safety harnesses –Harness - $90 –Lanyards - $90 –Carabiners - $20 –Life Lines - $70 Each Must be checked with each use People in harnesses have to be connected to safety cables at all times – requires 2 lanyards
6
Safety Rail –Railing with base plate and toe bracket 10’ - $400 + installation –Or cable (Rome Hosp.) Requires welder –Rail or wire must support at least 200 # on top rail –Must have toe board located on surface 2x4 – catches stuff before it falls
7
Used anywhere distance to ground >=6’ –Forms at Rome Hosp –Includes all ladders and stairways Also need nets for long vertical distances and over water
8
Trenches Any trench over 4’ deep – need ladder every 25’ for access –Over 5’ deep need to modify trench walls –Can bench trench walls or slope away from opening –May need to use trench box or sheet piles –Trenches are inspected on daily basis Adds to excavation cost
9
Eyes, Ears, nose and throat Cutting concrete, solvents, cement, demolition Sawing, drilling, hammering Pneumatic hammers Etc
10
OSHA Regs Regs
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.