Presentation is loading. Please wait.

Presentation is loading. Please wait.

BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.

Similar presentations


Presentation on theme: "BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW."— Presentation transcript:

1 BUILDING UPDATE AUGUST 23,2014

2 BUILDING “A” NORTHEAST VIEW

3 In side the aux gym - view looking northeast

4 Main Gym- view from the upper hallway

5 Main Gym (aux gym to the right)

6 Aux Gym – view from the hallway Note the precast concrete floor panels

7 Upper hallway between the Main Gym (to the left) and Aux Gym (to the right)

8 Upper Hallway from the gyms back to the Building A (looking east) Auditorium and cafeteria on the right of the hallway.

9 Construction of the main lobby connecting Building A (to the right) to Buildings C and D (to the left) View from the south.

10 Upper hallway from Building A to auditorium and gyms (looking west)


Download ppt "BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW."

Similar presentations


Ads by Google