Download presentation
Presentation is loading. Please wait.
Published byLaura Randall Modified over 9 years ago
1
1
2
◦ Public hearing certifying compliance with Govt. Code 4217.10 for energy projects. From proforma: Estimated total project cost is $4.09M. Estimated first year energy savings $274K. Estimated lifetime energy savings $12.14M. $11.6M net savings to District. Environmental benefits annually: Eliminate 22.4M kg of nitrous oxides (NOx) Eliminate 12.6M kg of sulfurous oxides (SOx) Eliminate 0.84M kg of other particulates Eliminate 1.4 tons of carbon dioxide (CO2) Also bank Renewable Energy Credits (REC’s) with an estimated value of $165K. 2
3
3
4
◦ Approve CEQA categorical exemptions via resolutions 13-14-14 to 13-14-19: District Office, Price MS, Bagby ES, Fammatre ES, Farnham ES, Sartorette ES ◦ Contracts: Geotech investigation to Cleary Consultants for $62,000 Architectural design contract to Sugimura Finney for $119,500 Construction management to Kramer Project Development Co. Inc. for $469,500 Construction Contract to Cupertino Electric via resolution 13-14-20 in compliance with Govt Code 4217.12 for $3,085,328 4
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.