1
Haroon Rafique 11/06/2015HR IIAA Group Meeting1
2
Richmond Virginia 11/06/2015HR IIAA Group Meeting2
3
Sunday – Student Poster Session 11/06/2015HR IIAA Group Meeting3
4
Sunday – Opening Ceremony 11/06/2015HR IIAA Group Meeting4
5
Monday – Opening Session 11/06/2015HR IIAA Group Meeting5
6
Monday – LHC Commissioning ~ 3000 magnet interconnects replaced (of ~10k) in LS1 Aperture restriction found in middle of dipole 15 in IR8 – investigation (was) underway Energy of 6.5 TeV is due to magnet training: 6-12 hour recovery, estimated 150 times for 6.5TeV, required 120. Need ~1000 for 7TeV 11/06/2015HR IIAA Group Meeting6
7
Monday – IOTA @ Fermilab Integrable Optics Accelerator Can operate with either electrons or protons (up to 150 MeV/c Large aperture Significant flexibility of the lattice Precise control of the optics quality and stability Set up for very high intensity operation (with protons) Large tune spreads – can cross integer resonances? 11/06/2015HR IIAA Group Meeting7
8
Monday 11/06/2015HR IIAA Group Meeting8
9
Tuesday – Franz neutron source 11/06/2015HR IIAA Group Meeting9
10
Tuesday - HiLumi Beam Diagnostics LHC BLMs are radiation tolerant HiLumi BLMs must be radiation hardened Cryo BLMs Button BPMs (18 tertiary collimators installed) All future colls with button BPMs 2 orders of magnitude faster positioning of colls 11/06/2015HR IIAA Group Meeting10
11
Tuesday – SPS Collimation 11/06/2015HR IIAA Group Meeting11
12
Tuesday - Posters 11/06/2015HR IIAA Group Meeting12
13
Wednesday – Space Charge Codes 11/06/2015HR IIAA Group Meeting13
14
Wednesday – LHC HEL Development HiLumi CC Failure ~ 1σ kick; actively deplete beam halo Use HEL to do so Alternatives (transverse damper, tune ripple…) HEL: lower intensity without luminosity change 10KV @ 5A, 3m long s shaped HEL beam at 4-8 σ Final decision after Run II experience 11/06/2015HR IIAA Group Meeting14
15
Wednesday - FCC Luminosity ~ 20 x LHC 5 MW Synchrotron Radiation losses 93 km better cost/risk than 100km – due to depth of tunnel under lake Geneva Max B = 16 T (R&D Target) 215m cell length Large aperture quads (cf. HiLumi) Scaled Collimation study underway 11/06/2015HR IIAA Group Meeting15
16
Wednesday – Women in Science 11/06/2015HR IIAA Group Meeting16
17
Thursday – Awards 11/06/2015HR IIAA Group Meeting17
18
Thursday – Recap of PACs 11/06/2015HR IIAA Group Meeting18
19
Thursday – Banquet 11/06/2015HR IIAA Group Meeting19
20
Friday – Closing Session 11/06/2015HR IIAA Group Meeting20