Download presentation
Presentation is loading. Please wait.
Published byMillicent Reed Modified over 9 years ago
1
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) WEND WG REPORT
2
To advice IRCC and to assist in facilitating a worldwide consistent level of high quality, updated official ENCs through integrated services that support chart carriage requirements of SOLAS Chapter V and the requirements of the IMO Performance Standards for ECDIS WEND Terms of Reference
3
5th WENDWG meeting Singapore March 2015 Review decisionsd/outcomes/actions of IRCC6, EIHC5 & HSCC6 affecting WEND Overlay Services Update report on Overlapping ENCs study Review WEND Principles & Goverenance ENC Coverage Status Review
4
5th WENDWG meeting Singapore March 2015 (cont’d) ENC Gaps, Overlaps & QA ENC Distribution & RENC reports IHO ENC Catalogue Development S101 in relation to WEND Work Programme
5
WENDWG 5 Report to IRCC Detail at IRCC7-08D
6
Key Aspects Overlay Services RHCs encourage to monitor such services UK provide AIO safety of navigation issues to ENC producers & seek consent. RHCs & ENC producers to solve AIO matters bilaterally & report to WENDWG UK provide AIO risk/benefits assessment Final report to HSSC7 & IRCC8
7
Key Aspects Overlapping ENCs Singapore leading the study. Working with OEMs to test ECDIS test cases in Malacca & Singapore Straits ICENC running ECDIS overlapping ENC scenarios. USCHC trans-Boundary Project lessons published on IHO Website (IRCC7-09C)
8
Key Aspects WEND Principles & Governance See IRCC7-09A Guidelines to remain unchanged ENC Production Guidance S65 to align with current version of WEND Principles/Guidelines (HSSC action)
9
Key Aspects WEND Principles & Governance (cont’d) PRO-7/EIHC Decision 12 (Full Implementation of WEND Principles) considered by break-out group chaired by FR rep Work plan methodology included in work Programme
10
Key Aspects WEND Principles & Governance (cont’d) Identify articles not fully implemented Identify barriers preventing implementation Propose corrective actions Define long term consequences where no corrective action exists Interim Report at WENDWG6 Final Report at IRCC8
11
Key Aspects ENC Coverage Status Review 2014 figures reflect Small Scale – 100% Medium Scale – 90% Large Scale – 97% Note cruise lines planning to use over 1000 ports in “new & exotic” locations
12
Key Aspects Gaps, Overlaps & QA Analysis of gaps/overlaps permanent RHC function. RHCs should update ports/anchorages list Consider adopting Risk Assessment Methodology AIS data use may be valuable
13
Key Aspects ENC Distribution Good work by both RENCs Disestablish RHSG absorb as business- as-usual bilateral activity by RENCs RENCs to take forward harmonisation and WENC concept WENDWG to monitor
14
Key Aspects IHO ENC Catalogue See IRCC7-09B Progress incremental development within IHO GIS environment Accept ENCs offer on coverage/overlap checker tool being made available for RHCs/ICCWG coordinators
15
Key Aspects S101 Consider impact of S101 implementation ENC updates ENC scheming WEND to monitor
16
Key Aspects Performance Indicators Considered by break-out group chaired by IHB Satisfactory & no further changes proposed.
17
Key Aspects Progress on IRCC Items Status reported to IRCC secretary Included in the 2015/16 WEND Programme of Work
18
Action Required of IRCC & 2015/6 WENDWG Programme of Work Refer to IRCC7-08D Para 20 & Annex A
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.