Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon-121001.

Similar presentations


Presentation on theme: "Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon-121001."— Presentation transcript:

1 Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon-121001

2

3 Construction of 661 Km of 400 kV D/C interstate transmission line between Pallatana GBCCPP and Bongaigaon passing through the states of Tripura Meghalaya and Assam  The line route passes through Hilly Terrain (300 km),Reserved Forests(130km) as well as Cultivated Land.  Crossing of major rivers. Viz. Brahamputra, Barak and Champabati involved

4 Pallatana- Silchar 400 kV D/C line (246 Km, 675 locations )  Situated in heaviest wind zone (WZ-6, 55 m/s)  Hilly terrain 96 Km (39%)  Forest involvement (35%)  Tripura -- 81 Km, 372 ha, 200 locations  Assam – 04 Km, 18.4 ha, 8 locations

5 Silchar- Bongaigaon 400 kV D/C line ( 415 Km, 1125 locations)  Situated in heavy wind zone (WZ-5, 50 m/s)  Hilly terrain 208 Km (50%)  Forest involvement (11%)  Meghalaya -- 25 Km, 115.8 ha, 55 locations  Assam – 22 Km, 101.2 ha, 65 locations  Involve Major River Crossings  Brahmaputra river – 2 well foundations and 1 pile foundation  Champabati river – 1 pile foundation  Barak river – River crossing towers on banks.

6

7  Total cost of Project:Rs. 1770 Cr Equity:Rs. 354 Cr (148* Cr) Debt :Rs. 1416 Cr (599* Cr) * Position as on 31 st March 2011)

8 NameEquity Pattern Equity Share allotted/ Approved for allocation (as on 31/03/2011) In Rs. crore In % OTPC35%3529 POWERGRID26%3025 ASSAM13%1512 TRIPURA10%10.49 Mizoram10%10.59 Manipur6%2016 TOTAL100%120.9100

9 NameEquity Pattern Based on Total Share Application Money Received up to 17/03/2011 In Rs. croreIn % OTPC35%52.5936 POWERGRID26%39.126 ASSAM13%1510 TRIPURA10%10.47 Mizoram10%10.57 Manipur6%2014 TOTAL100%120.9100

10 Sl NoDescription Total Quantity Quantity as per L2 schedule Quantity completed % with reference to L2 schedule 1 Survey (Km) 246 100% 2 Foundations (Nos.) 675625495~79% 3 Tower erection (Nos.) 675582286~49% 4Stringing (Km) 24617932~18%

11 Sl NoDescription Total Quantity Quantity as per L2 schedule Quantity complet ed % with reference to L2 schedule 1 Survey (Km) 415 100% 2 Foundations (Nos.) 1125966582~59% 3 Tower erection (Nos.) 1125876299~34% 4Stringing (Km) 41529622~7%

12 Sl. No. Description Total Quantit y Quantity as per L2 schedule Quantity complete d % with reference to L2 schedule 1 Survey (Km) 661 100% 2 Foundations (Nos.) 180015911077~68% 3 Tower erection (Nos.) 18001458585~40% 4Stringing (Km) 66147554~11%

13  Forest Clearance: Approximately 208 locations are falling within forest area (Tripura:81 Km, 200 loc.) and (Assam:4km, 8 loc.). Second stage forest clearance for Assam is yet to be obtained. Replies to queries raised by MoEF to Assam on 04.10.2010 were forwarded to MoEF on 19 th February 2011. The MoEF vide their letter dated 15 th April 2011 to Assam Forest department sought further details in respect of the scheme for plantation of dwarf trees and compliance to Forest Rights Act (2006). Second stage forest clearance for Tripura has been obtained in August 2010 only i.e. approximately 13 months after award of construction contract. Tree felling and construction of line in the forest stretches are in progress. Meanwhile case submitted on 4 th March 11 for additional 3 locations falling in forest near GBCCP gantry for which fresh clearance is required.  Only one month is left in the working season  Non-availability of adequate no. of trained gangs for deployment at site by the contractors

14  Forest Clearance  Approximately 104 locations are falling within forest area (Meghalaya 55) and (Assam 65).  Second stage forest clearances for Meghalaya ( 25 Km approx.) & Assam(22 Km approx.) is yet to be obtained even after 13 months since award of Construction Contract.  Replies to queries raised by MoEF to Meghalaya on 24.12.2010 and to Assam on 04.10.2010 have been forwarded by them to MoEF on 16 th & 19 th February 2011 respectively. The MoEF vide their letter dated 15 th April 2011 to Assam Forest department sought further details in respect of the scheme for plantation of dwarf trees and compliance to Forest Rights Act (2006). The MoEF also sought additional details regarding compliance to Forest Rights Act (2006) from Meghalaya state Forest Department vide their letter dated 18 th April 2011.  Only one month is left in the working season before the scheduled completion of the line and delay in obtaining second stage forest clearance is adversely affecting the project.  Non-availability of adequate number of trained gangs for deployment at site by the contractors.  Involvement of pile & well foundations in Champabati, Barak and Brahmaputra rivers.

15 Sl. No. Name of lineScheduled date of completion Anticipated date of completion 1Pallatana-SilcharNovember 2011 2Silchar- Bongaigaon November 2011 June 2012

16

17 Line Check SurveyFoundation Tower Erection Stringing Total Qty. Actual Total Qty. Actual Total Qty.Actual Total Qty. Km Actual Pallatana- Silchar. Ant Compln Nov’11 245 67437167418324511.291 Silchar - Bongaigaon. Ant Compln Jun 12 418 112539011251254181.64 TOTAL663 1799761179930866313

18 Line Check SurveyFoundation Tower Erection Stringing Total Qty. Actual Total Qty. Actual Total Qty.Actual Total Qty. Km Actual Pallatana- Silchar. Ant Compln Nov’11 246 67541567523824624 Silchar - Bongaigaon. Ant Compln Jun 12 415 112550511252174158 TOTAL661 1800920180045566132

19 Line Check SurveyFoundation Tower Erection Stringing Total Qty. Actual Total Qty. Actual Total Qty.Actual Total Qty. Km Actual Pallatana- Silchar. Ant Compln Nov’11 246 67546067526124628.188 Silchar - Bongaigaon. Ant Compln Jun 12 415 1125551112526141514.264 TOTAL661 18001011180052266142.452