Potential Dental Clinic Provide a on-site dental clinic – Utilize the same vendor that provided the mobile dental clinic (Onsite Health) – Mobile clinic was booked 1.5 days/week – New clinic start at 3 days/week – At 12 months projected at 5 days/week – Self Contained – Onsite Health - provide dental chairs and equipment Everything needed to run a clinic – No cost to SPE
2
Potential Dental Clinic Location – Eric’s office Too small – only one chair would fit. – Next option was a synergistic location close to Medical – Robert Young 1416 and 1418 – currently used by: Screen Gems for storage Production Relocation Services as an office – Onsite Health will reimburse SPE for: TI needed to prepare their space for the clinic Cost to relocated Relo Services to a new location
3
Potential Dental Clinic Vacating RY1416 and RY1418 – Relocation Services Worked with Facilities and Studio Operations to evaluate any and all potential spaces on east side of Lot Best option was to build an office inside Plant 3, where they currently store furniture. Also, if space is available, purchase shipping container for additional production furniture storage near basketball court – Screen Gems storage can be moved by mid- January.
4
Relocate Production Relocation Services
5
Robert Young 1416/1418
6
Potential Dental Clinic New Dental Clinic (RY1416/1418) will need: – flooring, paint, door, domestic water and a drain – Onsite Health - design and pull necessary permits – Onsite Health - reimburse SPS to build-out space (est. $15K)
7
Plant 3 – South Space
8
Potential Dental Clinic New Relo office in Plant 3 will need: – Four walls, lid, HVAC, power and data – SPE vendor to design – Onsite Health reimburse SPS to build-out space (est. $35K) reimburse SPS for new shipping container (est. $5K)
9
Potential Dental Clinic Contract – Susan Ross – Automatically renewing contract, with option out – $150K in dental equipment – $60K in improvements to RY1416/1418, Plant 3 & shipping container SEHS/Finance/Facilities – Today – Steve Bernard to discuss with Dave Hendler People and Organization – Jaime Chung to discuss with George Rose