FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.

Similar presentations


Presentation on theme: "FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley."— Presentation transcript:

1 FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley

2 FM2 PPSRAGENDA 2 UCB, March ??, 2006 Sep System Shock Test Shock Test Personnel: Paul Turin and Greg Dalton, Don Jaroz observing THM-MINT-PROC-070 Sep Sys Test Procedure Test performed after vibration testing Probe is lifted from vibe table, craned to the firing location above a cushion. Accelerometers are in place from vibe test (Sep Ring @ pyro bracket, IDPU foot, BAU foot, Xponder foot) Instrumentation is hooked up (JPL will collect data) Single pyro will be fired using NSI Mil spec firing box Nonessential personnel will be cleared from bay during setup, cell phones banned within 30’ All personnel will be behind bay door for test firing We will film the test

3 FM2 PPSRAGENDA 3 UCB, March ??, 2006 Sep System Shock Test cont. Post Test Inspection/Test Visual inspection of Sep System components Probe LPT for IDPU/BAU checkout ESA HV turned on and channel plate checkout in TV –ESA shock test performed on ETU sep system, no problem Post Test Restow System will be stowed for thermal vac without pyros Flight restow will occur at end of test sequence of all five probes