2 Page 2 EUEB, March 8, 2012 Thank you very much for your invitation

3 Page 3 Status of the project January 16, 2012: Kick- off meeting Chiara Briatore/ELC; Jürgen Sturm/ELC; Otmar Franz/Osram; James Hooker/Havells-Sylvania; Peter Hunt/Lighting Association, UK; Kees Van Meerten/Philips Lighting; Michel Quicheron/JRC, Ispra; Renata Kaps/JRC, Seville Stakeholders: Stephen Bonner/Texas Instruments; Christianna Papazahariou/LG Electronics; Dirk Van Hessche/PlasticsEurope Launch of Eco-Lighting website: http://www.eco-lighting- project.eu/http://www.eco-lighting- project.eu/ New assignment to carry out within the “Eco-Lighting project”: Ecolabel and GPP drafting criteria

4 Page 4 Status of the project Eco-lighting = Ecolabel + GPP criteria revision CELMA – European Luminaires Association – invited to join the Eco-Lighting Steering Committee for GPP criteria revision, to take care of the system approach - luminaries, controls,..- Ecolabel Scope: household, domestic, LEDs GPP Scope: revision of Indoor and Street Lighting including LEDs and Lighting Management Systems

5 Click to edit Master title style 5 Ecolabel and GPP criteria development process Common preliminary report Proposal for technical report and draft criteria areas First Ad Hoc Working Group (focus on ecolabel) Technical report and draft ecolabel criteria Technical report and draft GPP criteria Second Ad Hoc Working Group (two following days, one Ecolabel, one GPP) EUEB GPP Advisory Group Regulatory Committee Ecolabel criteria GPP criteria Possibility for all stakeholders to comment Possibility for all stakeholders to participate Coordinated annual workplans for GPP and Ecolabel

6 Page 6 Tasks and Tasks leaders Task 1 - Product group definition - Kees van Meerten (Philips) Subgroup task 1: K van Meerten, Otmar Franz, Zoltan Pilter, Klaus Meyer-Pohl, Chiara Briatore Task 2 - Economic and market analysis – C Briatore (ELC) Subgroup task 2: C Briatore, JRC, IPTS, Peter Hunt, Tom Lock Task 3 - Technical analysis (including BAT/BNAT) - Nils Borg (Eceee) Subgroup task 3: Nils Borg, Kees van Meerten, Otmar Franz, James Hooker, Zoltan Pilter, Peter Hunt, Tom Lock, Klaus Meyer-Pohl Task 4 - Policy impact and sensitivity analysis - Paolo Bertoldi (JRC) Subgroup task 4: P Bertoldi, Michel Quicheron, Renata Kaps Task 5 - Draft criteria proposal and technical background report – Z Pilter (GE) Subgroup task 5: P Bertoldi, Michel Quicheron, K van Meerten, Otmar Franz, Klaus Meyer-Pohl, James Hooker Task 6 - Final report and manuals - Juergen Sturm (ELC) Subgroup task 6: Juergen Sturm, DG Environment

7 Page 7 Timeline First we concentrate on the development of Ecolabel criteria Then we’ll take existing GPP criteria as starting point, and see how they need to be adapted in the light of the new Ecolabel criteria. GPP will be mainly CELMA task (Peter Thorns, Head of Strategic Lighting Applications/Thorn Lighting Ltd will officially join the project team and Steering Committee)

8 Page 8 Timeline March 2013 deadline to present the revised criteria to the June regulatory committee to be adopted (Final criteria + Technical background report + Preliminary report) feedback 2 nd AHWG 2 nd AHWG on January 2013 – 2 following days – one Ecolabel, one GPP) draft final criteria + technical background report updated feedback 1 st AHWG 1 st AHWG on September 2012 – 1 day for both Ecolabel and GPP) 1 st criteria proposal + technical background report + working document publish preliminary report (June 2012)

9 Page 9 Timeline Before June 2012 (preliminary report): Scoping document (Task 1, on-going): will be published on the website end of March 2012 Market analysis (Task 2, on-going - questionnaire not necessary: team members provide data) Technical analysis + environmental assessment; improvement potential + BAT + LCC+ LCA (Task 3 to be started end of March) LCA: will fill in the gaps where necessary Submitted to external quality assessment Sensitivity analysis and policy impact (Task 4, to be started)

10 Page 10 Open questions and further clarification Ecolabel fees - Business case Company A has an energy saving product whit 5 different wattages (to replace 25 to 100 watt GLS) with 2 different lamp caps (E 27 and B22), two different voltages (220 and 240), two different colours (warmwhite and cool daylight) = 40 types x 1.500 (German example)= 60.000 euros x year x product Market Surveillance Companies and consumers have to be reassured on the effective protection of the label against infringement