Download presentation
Presentation is loading. Please wait.
Published byBertram Rice Modified over 9 years ago
1
STS-114 Mission Objectives Test and evaluate new inspection and repair techniques Deliver supplies and cargo to the Space Station via the Raffaello MPLM –Mini Pressurized Logistics Module Deliver and install –Replacement CMG (control moment gyro) –External Stowage Platform
2
STS-114 Vehicle Changes External Tank heaters / foam replacement Orbiter Boom Sensor System (OBSS) –50 foot starboard boom –2 laser imaging sensors Wing Leading Edge Impact Detection –Sensors located in leading edge Reinforced Carbon- Carbon surfaces External Tank / SRB mounted cameras
3
STS-114 Return to Flight Successfully completed all primary mission objectives ( + 1 docked day) Most imaged mission ever flown Demonstrated orbit self-inspection via –OBSS –R-Bar Proximity Maneuver (RPM) Exercised real-time ground imagery analysis Performed limited tile repair experiment
4
Flight Day 1 ET Sep Photos
6
Orbiter Boom Sensor System
7
Flight Day 2 OBSS
9
Flight Day 3 R-Bar Pitch Maneuver
12
STS-114 MER 1 st flight in the new MER facility Major Activities –Certifying wing leading edge for entry –Certifying tile for entry –Impact of protruding gap filler –Impact of damaged thermal blanket
13
Protruding Gap Filler
15
Window 1 Thermal Blanket
16
SSP MER
17
Undock from ISS
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.