Download presentation
Presentation is loading. Please wait.
Published byPierce Franklin Modified over 9 years ago
1
M Bonesini1 M. Bonesini – INFN Milano TOF news
2
M Bonesini2 Review of planned work TOF technical designs (structure of detectors, supports, …) will be delivered to Wing in.dwg format in a few days More work on PMTs tests is foreseen
3
M Bonesini3 Tests on R49998 PMTs We plan to have a custom built magnet at Milano Bicocca (solenoid or Helmholtz coils with B up to 100-200 gauss) for in house tests of R4998 PMTs VME QADC+TDC system (with AGILE DAQ) ready Fast home-built laser system (AVTECH fast pulser + NICHIA Laser diode at 400 nm) ordered (rate up to 1 MHz)
4
M Bonesini4 Tests on Fine-mesh PMTs Additional test at LASA (mainly for rate effects with a laser light cycle simulating ISIS) in preparation at LASA with Pavia MEG group for March/April 2005 Tests with 1”,1.5”,2” fine-mesh PMTs Same equipment as in-house tests + Hamamatsu Laser PLP10 on loan (rate up to 10 MHz)
5
M Bonesini5 What I need To finalize TOF station design I need final infos on Space available at TOF station positions laterally to MICE cooling section (to recess TOFs for calibration with cosmics) (Wing ?) Final B field maps at TOF0… positions (Kevin, Tom ?) Final evaluation of rates at TOF0 … positions (Tom ?)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.