Presentation is loading. Please wait.

Presentation is loading. Please wait.

ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.

Similar presentations


Presentation on theme: "ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009."— Presentation transcript:

1 ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009

2 Cathode isolation Valve Cathode installation assembly Beam line isolation valve Top cover with facilities feedthru Cavity assembly Internal Helium dewar Adjustable supports Magnetic and thermal shielding HOM Load Power coupler Cryomodule Configuration

3 Beam Line Vacuum Failure  Two vacuum system failure modes Small leak into beam line and cryopumped by cold surfaces of SRF cavity. - Vacuum instrumentation will show abnormally high pressure in advance of cavity pumping sufficient air to go positive on warm up. Catastrophic venting of beam line while cold resulting in significant solid air formation on the cold surfaces of the SRF cavity. - Heat transfer to solid air insufficient will not result in a flow rate higher than burst disk.

4

5 Flow rate of singe burst disk/vent line @ 6 psig internal 217 Heat Load (Watts) RT Flow Rate vs Heat Load

6

7

8

9

10 Impulse Force on Vent Piping (5-cell) The potential reaction force from the impulse of released cold gas was calculated using the method presented in API-RP520 (American Petroleum Institute). F = W ((kT/(k+1)m)1/2 / 366) +A0P2 Where:W = Discharge flow, 5940 lbs/hr (0.75 Kg/sec) k (helium) = 1.66 T = temperature, 9.6° R (5°K) M (helium) = 4 A0 = 12.6 in2 P2 = 0 (flow velocity in the vent pipe is subsonic) In this case, the impulse force is 20 lbs. ASME B31.1 Power Piping Code recommends using a dynamic load factor of 2.0 to allow for the instantaneous force at the time the relief valve opens. Depending on the final configuration of the vent header pipe run, the maximum force imposed on the string assembly or any other portion of the vent header is 40 lbs.

11 5-cell Burst Disk to Vent Header

12

13  BS&B leak tests 10% with a minimum of two per production run.  Minimum net flow area for the device is 1.496 sq in. (area of 1.5” tube).  Over 50 units in service with no reported failures.

14 Trapped Helium in Warm Bore Sector Valves  Helium vapor enters warm injection line from catastrophic failure and is trapped when isolation valves close. Sector valves take ~3 seconds to close which can allow sufficient helium vapor/liquid to enter warm space that would result in a positive pressure when warm. - Volume of injection line and components - ~1.5 cu. ft. - Requires ~50cc of liquid to go positive on warm up.  Warm bore spaces will have burst disks installed to relieve. Can release up to 5000 cu ft and still maintain 16% oxygen in cave. - Assume entire warm bore volume is 100% LHe - 750x expansion results in 1125 cu ft.  Will release helium into cave and not be plumbed into vent header. Will use the commercially available UD certified 11.5 psi device.

15 Certified Burst Disk for Warm Bore  UD certified  Available from MDC  On order


Download ppt "ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009."

Similar presentations


Ads by Google