Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK
2
Works Contract WWTP Balchik Commencement Date:28 th June 2006 Completion Date: 10 th March 2010 Physical Execution:100 % Contract Price:3 868 061.09 Euro WWTP became operational on 10 th March 2010
3
Taking –over of the Works and Sections of WWTP Balchik
4
WWTP BALCHIK Aeration tank Sludge tank
5
WWTP BALCHIK Main Tanks
6
Scroober installation at Chlorination Building WWTP BALCHIK
7
Balchik Water Supply& Sewerage Network Connections Works Contract ISPA Measure 2002 BG 17 P PE 017 Commencement Date: 07 th January 2008 Completion Date: 23 th December 2011 Physical Execution:100% Contract Price: 8 658 308.34 Euro The Water Supply and Sewerage networks became operational on 23 th December 2011
8
Balchik Water Supply& Sewerage Network Connections Information boards
9
Balchik Water Supply&Sewerage Network Connections Main sewerage and house connections Compaction as layer on sewer line, Part III, Section F
10
Backdrop Manhole, Part IV, Section A Balchik Water Supply&Sewerage Network Connections Excavation on water supply main pipe, Part IV, Section A
11
Balchik Water Supply& Sewerage Network Connections Excavation on Water Main – G. Milev Street
12
Balchik Water Supply& Sewerage Network Connections Covering pipe for pressure under the Kavarna motorway
13
Balchik Water Supply& Sewerage Network Connections Main to Reservoir (Tsarichino) excavation
14
Balchik Water Supply& Sewerage Network Connections Welding activities on Tsarichino main pressure conduit