BINP Workshop consists of two divisions (Workshop-1 and Workshop-2) : Total area more than 55,000 m 2. Total work power more than 1,000,000 work hours.

Similar presentations


Presentation on theme: "BINP Workshop consists of two divisions (Workshop-1 and Workshop-2) : Total area more than 55,000 m 2. Total work power more than 1,000,000 work hours."— Presentation transcript:

1

2 BINP Workshop consists of two divisions (Workshop-1 and Workshop-2) : Total area more than 55,000 m 2. Total work power more than 1,000,000 work hours per year. Total staff around 1000 workers/engineers. Budker INP Workshops I. Half-finished Article DivisionII. Mechanical Division No 3 III. Mechanical Assembly Dept No 5IV. Mechanical Treatment Dept No 6 V. Vacuum Department No 8VI. Department No 7 (Electromagnets) VIII. Test And Measurement DepartmentVII. Engineering Departments. IX. Auxiliary Departments Bays and departments

3 Budker INP Workshops Technology capability Maximum element weight 20 tons Maximum diameter of treated element 4000 mm Maximum size of treated element 6000 x 1500 mm Accuracy 2.5 micron Roughness 0.05 micron Maximum sizes of vacuum furnace (T = 950 C) Ø 2000 x 1000 mm Maximum temperature in thermal furnace 1500 C Maximum hydraulic press force 1000 tons

4 Quality Assurance Programme All materials meet Russian Standard (GOST). If necessary, we can select adequate materials corresponding to the foreign ones. When required, we perform material input control either in our laboratory or with the help of other laboratories. Workshop has a QA-control, test and measurement department, which performs control and testing of all parts and units for their compliance to specifications and drawings and carries out mechanical, electrical, hydraulic and vacuum tests, magnetic and RF measurements. When fabricating products under an international contract, a special route list is filled out, which accompanies the product throughout all of the technological processes. The final product is supplied with a traveler or an inspection report with all parameters, tests and measurements listed in it. Now ISO-9001 standard is being certificated. Budker INP Workshops