Download presentation
Presentation is loading. Please wait.
Published byEustacia Elliott Modified over 9 years ago
1
1 Using WinSLAMM For Stormwater Retrofit in Urban Environments August 22, 2011 StormCon 2011, Anaheim, CA Presented by: James Bachhuber PH Caroline Burger PE AECOM Madison, WI
2
2 Dense Urban Land Uses Require Stormwater Retrofitting Open space is very limited Land values are very high Treatment measures have higher safety & aesthetic requirements
3
3 Overview of Santa Monica Stormwater Study Purpose of Study: Test WinSLAMM approach to stormwater management Identify priority land uses for pollutant generation Compare alternative stormwater management for pollution control levels
4
4 Overview of Santa Monica Stormwater Study Basic Approach: Identify representative pilot study area Create WinSLAMM files to represent local conditions Source areas Rainfall Drainage Soils
5
5 Overview of Santa Monica Stormwater Study Basic Approach (continued): Model pilot area with no management measures (base condition) “Retrofit” alternative management practices to predict runoff volume & pollution control achieved
6
6 Overview of Santa Monica Stormwater Study Stormwater Practices Analyzed: Street cleaning (vacuum assist) Porous pavement Infiltration Pits Biofilters
7
7 Project Area – Land Use
8
8 Project Area Commercial Land Use
9
9 Project Area School Land Use
10
10 Project Area Medium Density Res. Land Use
11
11 Project Area
12
12 Project Area – Source Area Delineations Source Areas Residential – High Density
13
13 Project Area – Source Area Delineations Residential – Low Density Source Areas
14
14 Project Area – Source Area Delineations Source Areas Residential – Single Family
15
15 Project Area – Source Area Delineations Source Areas Commercial
16
Project Area – Source Areas
17
17 WinSLAMM Modeling Results WinSLAMM Model Comparison of Development Scenarios
18
18 WinSLAMM Model Inputs Source Areas in WinSLAMM: Conventional LID Roofs Disconnected Single Sidewalk Narrower Streets
19
19 Model Inputs WinSLAMM Road Swale Description:
20
20 WinSLAMM Model Inputs WinSLAMM Infiltration Basin Description:
21
21 WinSLAMM Modeling Results WinSLAMM Model Comparison of Development Scenarios
22
22 WinSLAMM Modeling Results WinSLAMM Model Comparison of Development Scenarios
23
23 WinSLAMM Modeling Results WinSLAMM Model Comparison of Development Scenarios* * Annual loadings from 43.2 acre Cedar Hills development
24
24 Questions / Discussion
25
25
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.