Download presentation
Presentation is loading. Please wait.
Published byAngelina McGee Modified over 9 years ago
1
f 1 MW Proton Beam for Neutrinos Dave McGinnis AAC Meeting May 10, 2006
2
f AAC Meeting – May 10,2006 - McGinnis 2 Motivation Develop an alternative plan to provide high intensity proton beams for the neutrino program beyond 2010 The plan needs to have the following important features It must be inexpensive It must be completed quickly It should not shutoff the collider complex or the neutrino program for an extended period of time. These goals can be accomplished only if: It uses the present Fermilab infrastructure (tunnel enclosures, service buildings, power, utilities, etc.) The project is staged After the collider program concludes, the present antiproton production complex can be converted into a multi- stage proton accumulator for injection into the Main Injector. Accumulator -> Momentum Stacker Recycler -> Box Car Stacker
3
f AAC Meeting – May 10,2006 - McGinnis 3 Motivation Slip stacking multiple Booster batches in either the Main Injector or the Recycler is the central concept for reaching beam powers up to 700kW Longitudinal stacking at 8 GeV reduces the peak intensity requirement in the Booster Results in a smaller required aperture for the Booster Smaller space charge tune shift Reduced requirements on acceleration efficiency Above 700kW, the number of batches stacked into the Recycler can not be increased further by slip stacking because of the rather severe amount of emittance dilution that is fundamental to the slip stacking process. Momentum Stacking has much smaller longitudinal emittance dilution than slip stacking and can be used in place of slip stacking to achieve beam powers greater than 700kW
4
f AAC Meeting – May 10,2006 - McGinnis 4 Beams Document 1782 http://beamdocs.fnal.gov/AD-public/DocDB/ShowDocument?docid=1782
5
f AAC Meeting – May 10,2006 - McGinnis 5 Concept - Momentum Stacking in the Accumulator After acceleration in the Booster, the beam will be transferred DIRECTLY to the Accumulator ring The Booster is connected to the Accumulator via a re-built AP4 Line The new AP4 line is about 240 meters in length Use magnets from the AP2 line for 8 GeV operation Civil Construction 4.5 M$ The AP3 line needs to be connected to the MI-8 line The modification is about 100 meters in length Use magnets from the rest of AP3 Civil Construction 3 M$ AP4 Line AP3 Line Mod.
6
f AAC Meeting – May 10,2006 - McGinnis 6 Mechanics of Momentum Stacking The Accumulator was designed for momentum stacking Large momentum aperture ~ 84 x 2.8 eV-Sec Injection kickers are located in 9m of dispersion Injection kickers do not affect core beam Inject in a newly accelerated Booster batch every 67 mS onto the low momentum orbit of the Accumulator The freshly injected batch is accelerated towards the core orbit where it is merged and debunched into the core orbit Momentum stack 3-4 Booster batches T<133ms T=134ms T=0 Energy 1 st batch is injected onto the injection orbit 1 st batch is accelerated to the core orbit T<66ms 2nd Batch is injected T=67ms 2 nd Batch is accelerated 3 rd Batch is injected
7
f AAC Meeting – May 10,2006 - McGinnis 7 Multi-stage Proton Accumulator Scheme Momentum stack in the Accumulator Inject in a newly accelerated Booster batch every 67 mS onto the high momentum orbit of the Accumulator Decelerate new batch towards core orbit and merge with existing beam Momentum stack 3-4 Booster batches Extract a single Accumulator batch Every 200 – 270 mS At an intensity of 3-4x a single Booster batch Box Car Stack in the Recycler Load in a new Accumulator batch every 200-270mS Place six Accumulator batches sequentially around the Recycler Load the Main Injector in a single turn
8
f AAC Meeting – May 10,2006 - McGinnis 8 Multi-stage Proton Accumulator Production Cycle
9
f AAC Meeting – May 10,2006 - McGinnis 9 Momentum Stacking Output longitudinal emittance = 84 * 0.38 eV-sec Input longitudinal emittance = 84 * 0.08 eV-sec
10
f AAC Meeting – May 10,2006 - McGinnis 10 Advantages of Momentum Stacking Transient Beam Loading Slip stacking or barrier bucket stacking requires manipulating intense beams with low RF voltages in a mostly empty circumference In momentum stacking, the circumference is always uniformly loaded Speed of process Injected beam can be decelerated quickly towards the core beam Longitudinal emittance dilution The core beam can be debunched during stacking process reducing the amount of “white spaces” Cogging in the Booster Prior to injection into the Accumulator, the injection orbit of the Accumulator is empty The Accumulator injection system can be phase-aligned to the Booster which eliminates cogging in the Booster The Booster notch can be made in the Linac
11
f AAC Meeting – May 10,2006 - McGinnis 11 Momentum Stacking RF Curves
12
f AAC Meeting – May 10,2006 - McGinnis 12 Momentum Stacking Phase Space Input longitudinal emittance = 84 * 0.08 eV-sec Output longitudinal emittance = 84 * 0.38 eV-sec
13
f AAC Meeting – May 10,2006 - McGinnis 13 Extraction From the Accumulator After 3-4 batches have been stacked begin preparing to extract all the beam from the Accumulator to the Recycler Re-bunch the entire stacked beam at h=12 in the Accumulator (7.5 MHz) Low harmonic for a large enough gap between buckets which could accommodate kicker rise time High harmonic for fast synchrotron period for the speed of the process New system –need 30 kV/Turn in Accumulator
14
f AAC Meeting – May 10,2006 - McGinnis 14 Extraction Phase Space
15
f AAC Meeting – May 10,2006 - McGinnis 15 Box Car Stacking in the Recycler After 3-4 booster batches have been momentum stacked in the Accumulator, the beam would be transferred to the Recycler. 7.5 MHz MHz synchronous transfer New system Need 80kV/Turn for a 4.2 eV-sec bucket Accumulator phase ALIGNED to the Recycler The Accumulator is 1/7 of the Recycler’s circumference Boxcar stack six of the Accumulator batches leaving 1/7 of the Recycler ring for an abort gap. After 6 Accumulator batches have been stacked into the Recycler debunch 7.5 MHz beam in >80mS Re-capture in 53 MHz buckets for acceleration. Need 500 kV for 0.6 eV-sec 53 MHz RF system will be installed for slip stacking in the Recycler for the 700kW stage.
16
f AAC Meeting – May 10,2006 - McGinnis 16 Booster Throughput Scenarios All the Main Injector Intensity upgrades rely on increased Booster throughput
17
f AAC Meeting – May 10,2006 - McGinnis 17 Booster Performance Sept. 2005 Overall NUMI Pulses MiniBoone PulsesStacking Pulses
18
f AAC Meeting – May 10,2006 - McGinnis 18 Booster Efficiency Amount of beam power lost per pulse is inversely proportional to the repetition rate For simplicity the beam loss can be divided into two categories, beam loss due to creating the beam gap (notch) for extraction beam lost transversely during acceleration Acceleration (1-2%) Notching (8%) Collimation (6%) Notching (33%) Collimation (19%) Acceleration (48%)
19
f AAC Meeting – May 10,2006 - McGinnis 19 Booster Efficiency The total efficiency of the Booster is: f n is the ratio of the amount of beam loss during notching to the injection intensity f A is the ratio of the amount of beam loss during acceleration to the injection For a given notching fraction, the fraction of beam loss during acceleration that can be tolerated is: Assuming a guassian profile as a simple approximation, the amount of beam in the halo that is outside the aperture is:
20
f AAC Meeting – May 10,2006 - McGinnis 20 Booster Efficiency The amount of beam that is permitted to be in the halo is: The aperture required is : The half-aperture of the magnets is proportional to The transverse acceptance, The momentum acceptance The closed orbit displacement Compare designs with the same space charge tune shift
21
f AAC Meeting – May 10,2006 - McGinnis 21 Booster Throughput Scenarios The vertical aperture in the present Booster is 1.64 inches for the F magnets 2.25 inches for the D magnets The horizontal good field aperture is 4.3 inches for the F magnets 3 inches for the D magnets The RF cavities in the Booster are located between two D magnets The horizontal beta function is at a minimum The vertical beta function is a maximum. The RF cavity aperture is 2.25 inches. To increase Booster throughput, we have two knobs available Increase beam power lost in the Booster tunnel Increase the effective Booster aperture (or decrease the closed orbit distortion tolerance)
22
f AAC Meeting – May 10,2006 - McGinnis 22 Booster Intensity and Aperture Requirements
23
f AAC Meeting – May 10,2006 - McGinnis 23 Main Injector RF Beam loading will dominate the operation of the Main Injector RF system for 120 GeV beam powers greater than 700kW.
24
f AAC Meeting – May 10,2006 - McGinnis 24 Main Injector RF Curves
25
f AAC Meeting – May 10,2006 - McGinnis 25 Robinson Stability
26
f AAC Meeting – May 10,2006 - McGinnis 26 Power Tetrode Operating Point Grid voltage vs. anode voltage at 0.216s. The trajectory for1MW of beam power and a single tube mounted to each cavity is shown in blue, for two tubes mounted to each cavity is shown in green, and for a single tube with 700kW of beam power is shown in magenta. The red traces are for constant anode current of 0.1A, 20A, 40A, 60A, and 80A. The brown traces are constant screen current of 0.2A, 2A, 4A, and 6A. Tube waveforms at 0.216s for a single tube mounted to each cavity. The screen (green trace) and grid (magenta trace) currents are multiplied by 100 to fit on the vertical scale.
27
f AAC Meeting – May 10,2006 - McGinnis 27 Power Tetrode Output
28
f AAC Meeting – May 10,2006 - McGinnis 28 Main Injector Beam Loading Summary Active beam loading compensation can achieve larger Robinson stability margins for less RF power than externally loading the RF cavities. The requirements for 700kW of beam power for a single tube mounted on each cavity does not exceed normal operating parameters. It is possible to accelerate 1 MW of beam power with the current Main Injector RF system driven by a single tube and stay within the maximum rated specifications of the current power tetrode if active beam loading compensation is implemented and the power tetrodes are operated in Class C. However, the peak anode current required by a single tube at 1 MW of beam power is substantially above normal operating experience for reliable operations. The two tubes per cavity configuration provides substantial operating margin up to a beam power of 1.5 MW.
29
f AAC Meeting – May 10,2006 - McGinnis 29 Issues Once the SNUMI group provides a conceptual design report for slip-stacking in the Recycler, it will begin to further develop the concept of momentum stacking in the Accumulator. List of Issues Booster throughput Space charge effects in the Accumulator and Recycler Radiation shielding Beam-loading Transition crossing in the Main Injector Instabilities (electron cloud, coupled bunch, etc.) Etc…
30
f AAC Meeting – May 10,2006 - McGinnis 30 1.1MW Cost Estimate in k$
31
f AAC Meeting – May 10,2006 - McGinnis 31 Summary Momentum stacking has much smaller longitudinal emittance dilution than slip stacking and can be used in place of slip stacking to achieve beam powers greater than 700kW Because the Accumulator was designed for momentum stacking, the present antiproton production complex can be converted into a multi-stage proton accumulator Accumulator -> Momentum Stacker Recycler -> Box Car Stacker The multi-stage proton accumulator can supply enough protons for a 1.1 MW 120 GeV beam for a cost of about $31M The post-Proton Plan Booster should be able to provide the necessary proton flux The present Main Injector RF system could support 1MW but with little operating margin. A two tube system would provide substantial operating margin.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.