1
By: Mohsin Syed
2
Population – Over 180 Million Per Capita Income – US $1000/yr Energy Require- 1000kwh/person/yr Actual Energy Require – 160,000 MW/ yr Capacity – 20,000 MW (only 20% people have power available and 80% people have only 1 light bulb) Existing System has shortage of 10,000 MW
3
Engineering Industry of Pakistan is now mature with Automobile sector and Industrial sector experience All requirement of Infrastructure like: High Voltage Transmission lines Water supply systems High Pressure boiler system Control & automation system Wind Turbine blades & towers CAN BE MANUFACTURED LOCALLY
5
Hydel Coal Gas Renewal Energy Agro/Municipal Waste Wind Solar
12
Power Transmission Towers Power Transmission Line Hardware
14
Tension PanelControl Panel Distribution Board Bus Ducts Cable Ladders
17
Connectors