Presentation is loading. Please wait.

Presentation is loading. Please wait.

Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.

Similar presentations


Presentation on theme: "Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices."— Presentation transcript:

1 Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices

2 PROMOTING SUSTAINABLE AND EQUITABLE TRANSPORTATION WORLDWIDE

3 Aspiration ??

4

5

6

7 Cars don’t own our streets!

8 TRANSPORTATION IS NOT A TECHNICAL PROBLEM IT IS A MATTER OF PUBLIC POLICY

9

10 City buses are essential

11

12

13

14 WHAT IS THIS ??? METRO with a BUS !

15

16 Quality, Capacity, Safety, with Speed BRT systems that deliver world-class passenger experiences, economic benefits, and positive environmental impacts....not an old bus running in a bus-lane!

17 Buses have their own way Not stuck behind other vehicles. Bypass traffic jams 1 THE BASICS

18

19 Buses on the fast lane In the centre, not on the sides Continuous: not obstructed by slow moving vehicles, stationary vehicles, property accesses, and side lanes 2

20

21 All public transport users have to cross a road twice a day

22 No barrier is too high for people to cross. It is our job to make crossings safe.

23 3

24

25 Platform level boarding Matching station and bus levels Station ledge for gap-less docking Wide automated doors Passenger convenience: Safe & easy access for passengers of all ages, genders & ability Higher system speed: Quick boarding & alighting (saves up to 80% dwell time)

26 4

27 Off-board fare collection Higher system speed Convenience for passengers Prevents monetary leakage Automated ridership data

28 Three left turnsLeft turn + U-turn Left turn + 2 right turns 2-phase, not 4-phase. Right turns prohibited 5

29 Station Design and Bus-Station Interface Branding and Passenger Information Service Planning Infrastructure Integration and Access 2 3 4 5 BEYOND THE BASICS 1

30 passengers/hour/direction Buses operated as train 6000 15000 Bus Lane Tram / LRTMetro BRT 50000

31 Passing lanes at stations

32 “Build Metro with Buses!!!”

33 The BRT Standard: Ensuring quality www.brtstandard.org


Download ppt "Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices."

Similar presentations


Ads by Google