18-Nov-15 / 1 Strategic planning for hydropower in the Danube Sergiy Moroz WWF European Hydropower Summit, Bucharest 28 February 2012 Water and energy.

Similar presentations


Presentation on theme: "18-Nov-15 / 1 Strategic planning for hydropower in the Danube Sergiy Moroz WWF European Hydropower Summit, Bucharest 28 February 2012 Water and energy."— Presentation transcript:

1 18-Nov-15 / 1 Strategic planning for hydropower in the Danube Sergiy Moroz WWF European Hydropower Summit, Bucharest 28 February 2012 Water and energy

2 Content –Introduction –Strategic and project planning –Key NGO proposals 18-Nov-15 / 2

3 Prelude

4

5 Negative impacts

6 Legislative triangle Prevent deterioration / achieve good status / potential (2015) Halt biodiversity loss / restore (2020) Meet 20/20/20 goal (20% renewables by 2020)

7 Way forward Contribution of hydropower to meeting the region´s Renewable Energy targets About 30% of Danube basin river stretches and 85% of Danube in or along Protected Areas Wave of new hydropower stations in the pipeline, many in ecologically important river stretches  without careful planning, conservation values threatened, water quality status will deteriorate while energy challenges remain

8 Strategic and project planning

9 Integrated planning Integrated sustainable energy policy (energy saving, other renewable technologies…) Strategic planning upfront information on no go /non-favourable areas (see Water Directors Statement 2010, Hydropower Workshop Conclusions 2011) integrate water / energy / nature conservation objectives Planning on (sub-)basin level, but national plans can apply stricter conservation criteria

10

11 Strategic planning Strategic planning criteria: Non-deterioration of water quality/status halting loss of biodiversity (e.g. endemic spec., habitats of global/EU/national importance) Protect existing and potential longitudinal and lateral continuity/connectivity –migration of fish and invertebrates (benthos) –sediment (bedload) transport –Rivers / sections prioritised for restoration (floodplain restoration)

12 Strategic planning

13 Strategic planning tools Rigorous application of WFD art 4.7, Habitats Directive art. 6, SEA, EIA Raise capacity (where necessary) of and involve stakeholders Ensure proper legislative framework, independent monitoring & enforcement Consider environmental resource costs and values of ecosystem services in cost-benefit analyses

14 Market tools Feed-in tariffs (and other incentives) mandatorily linked to ecological criteria Stringent eco-electricity labels (e.g. nature made star) linked to ecological criteria

15 Timisoara, 21 Feb. 2012 Key NGO proposals

16 Timisoara, 21 Feb. 2012 Key NGO asks For immediate action: All high ecological status river stretches must be „no go“ River stretches in an along Protected Areas are by definition and law of high conservation value and should therefore be kept free of hydropower development to the largest possible extend

17 Timisoara, 21 Feb. 2012

18 Key NGO asks Next steps: governments & stakeholders develop integrated criteria for identifying no go / not or less favourable areas for hydropower development on basin-wide scale Map those areas  2 nd DRBM Plan develop and apply strategic planning mechanisms on national level within basin- wide (trans-boundary) framework

19 Thank you www.wwf.eu 18-Nov-15 / 19

20 WWF IN SHORT WWF is in over 100 countries, on 5 continents +100 WWF was founded In 1961 1961 WWF has over 5,000 staff worldwide +5,000 WWF has over 5 million supporters +5M Presentation title can go here Secondary text can run underneath Photo: © NASA


Download ppt "18-Nov-15 / 1 Strategic planning for hydropower in the Danube Sergiy Moroz WWF European Hydropower Summit, Bucharest 28 February 2012 Water and energy."