SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
2
Lisbon Inn 40952 State Route 154, Lisbon, OH
3
SUB MAR Flow
4
SUB MAR
5
SUB MAR
6
During Installation-Sept 2002 SUB MAR Exposed pipeline now protected by Submar Articulated Concrete Mattress Flow
7
07/29/03, approximately one year later SUB MAR
8
SUB MAR NOTE: We did not build the two upstream Bendway Weirs
9
SUB MAR Close-up of Bendway Weirs
10
Looking DS. Recently constructed low, relatively short (average of 25 ft. long) Bendway Weirs, Sept 2002 SUB MAR
11
Looking DS. The same 2 low, relatively short Bendway Weirs, 5 years later Sept 17, 2007. Bank is stable (very flat slope angle compared to the angle of repose) & well vegetated. SUB MAR
12
Looking DS at three Bendway Weirs- freshly constructed- Sept 2002 SUB MAR
13
SUB MAR Pix by derrick 9-17-2007 Looking DS at the same 3 Bendway Weirs 5 years after construction. Fines in BW’s have washed out, but well graded 18 to 24 inch stone is stable. Bank is stable.
14
Looking US at two low elevation Bendway Weirs, two years after construction, 05/11/2004. SUB MAR
15
Looking US at the same two low elevation Bendway Weirs, five years after construction, 9/17/2007. Note stable bank. SUB MAR
16
Looking US at a barely visible Bendway Weir, two years after construction (05/11/2004) SUB MAR
17
SUB MAR Pix by derrick 9-17-2007 Looking US at a barely visible Bendway Weir, five years after construction, bank is stable, & Bendway Weir is barely noticeable.
18
Flow from left to right over low-elevation Bendway Weir, two years after installation SUB MAR
19
SUB MAR Pix by derrick 9-17-2007 Flow from left to right over same low-elevation Bendway Weir, five years after installation
20
SUB MAR Great aquatic habitat due to the deep pools created by the Bendway Weirs. These pools were full of high quality fishes, indicating that water quality is excellent. {5 years after project completion} Pix by derrick 9-17-2007
21
SUB MAR Pipeline protection, two years after installation
22
SUB MAR Pipeline protection, five years after installation Pix by derrick 9-17-2007
23
SUB MAR Evidence of recent deposition due to flooding in the field adjoining the project Pix by derrick 9-17-2007
24
The end