Download presentation
Presentation is loading. Please wait.
Published byJanice Millicent Gibson Modified over 9 years ago
1
CARSON CITY FREEWAY PHASE 2B-1 PHASE 2 PHASE 2A PHASE 2B
2
CARSON CITY FREEWAY – PHASE 2
3
PHASE 2A FUN RUN
4
PHASE 2B-1 MAJOR FEATURES CLEARVIEW TO FAIRVIEW DRIVE Clearview Drive Bridge Clearview Drive Bridge Koontz Lane Bridge Koontz Lane Bridge Resurfacing of Edmonds Drive Intersection Resurfacing of Edmonds Drive Intersection Clearview Drive Koontz Lane Closure of Valley View Drive Closure of Valley View Drive Closure of Colorado Street Closure of Colorado Street Construct Cul-De-Sac Drainage Facilities Drainage Facilities Concrete Lined Channels and Box Culverts Local Street Drainage Landscaping – Topsoil and Hydroseeding of Disturbed Areas Landscaping – Topsoil and Hydroseeding of Disturbed Areas Utility Relocations Utility Relocations Carson City Water Lines Southwest Gas, NV Energy, AT & T and Charter Cable Estimated Construction Cost $15 Million
5
R/W DRAINAGE CHANNEL VALLEY VIEW DRIVE KOONTZ LANE S. EDMONDS DRIVE CLEARVIEW DRIVE LINE DRIVE R/W
6
S. EDMONDS DRIVE COLORADO STREET FAIRVIEW DRIVE INTERCHANGE DRAINAGE CHANNEL R/W
7
CARSON CANYON AT KOONTZ LANE BRIDGE LANDSCAPING – CARSON CITY ENHANCEMENTS
8
CARSON CITY FREEWAY – PHASE 2 Typical Section with Channel EXISTING GROUND DRAINAGE CHANNEL
9
Native Landscaping Treatments
10
PHASE 2B-1 UTILITIES UTILITY RELOCATIONS
11
CLEARVIEW DRIVE EDMONDS DRIVE LINE DRIVE DRAINAGE CHANNEL TEMP. WATER LINE TEMP. AT & T AT & T NV ENERGY G W R/W
12
KOONTZ LANE VALLEY VIEW DRIVE DRAINAGE CHANNEL S. EDMONDS DRIVER/W TEMP. WATER TEMP. GAS W G NV ENERGY R/W
13
COLORADO STREET CLOSED VALLEY VIEW DRIVE CLOSED
14
FAIRVIEW DRIVE FREEWAY CORRIDOR US-395
15
Questions & Answers
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.