1 The A.S.SO. Programme Environmental Actions for Sustainable Development
2
Adopted in the second half of 2003 The aim: “The integration of environemntal items into different policies”
3
In 2004 it was selected as a best practice to participate to GreenWeek Event
4
Axis I concerns the integration of environmental concerns in all the main economic sectors of the Region: -Industry; -Agriculture; -Craft; -Tourism The Asso Programme is divided into four Axes
5
Axis II This section supports Plans for the sustainable development of some environmetally critical areas
6
Axis III This Axis finances few pilot projects aimed to pursue an environmental sustainable development
7
Axis IV This section concerns general actions for the implementation of the whole Programme
8
Total cost of the Programme: € 1,320,000.00 Budget (2003) Axis I € 540,000.00 Axis II € 600,000.00 Axis III € 155,000.00 Axis IV € 25,000.00 Funding sources: National and Regional Funds
9
The four actions of the Axis I: Integration between Industry and Environment; Integration between Craft and Environment; Integration between Tourism and Environment; Integration between Agriculture and Environment
10
Action a) Industry/Environment Implementation of Environmental Management Systems within SMEs The projects were selected by a call Eligible territory: out of Objective 2
11
Results: 16 projects have been co-financed to set up EMSs and to achieve the certification or registration according to the UNI ISO 14001 and EMAS Regulation Total current co-financing: € 165.000,00
12
Action b) Craft/Environment The main aim: to set up some environmental consultancy services in order to improve the integration of environmental concerns into the craft sector The instrument: a Voluntary Agreement between the Marche Region and some Trade Unions of the craft sector
13
Environmental consultancy aimed to: -The adoption of lower environmental impact productive processes; -The realization of products with a lower environmental impact; -The implementation of EMSs within the craft sector
14
Expected results: - The opening of 12 “environmental info point”; -The onset of procedures for the EMAS registration of a craft district area. Current budget: € 172.000,00 (€ 86.000,00 regional funds contribution)
15
Action c) Tourism/Environment The aim: to improve regional tourist offer, directing it towards actions and forms with a lower environmental impact, and reducing the use of resources
16
Action c) is divided into two measures Measure 1: Design for the environmental enhancement of an area with high tourist concentration Measure 2: Projects for the eco-efficiency of tourist accommodation
17
Action c) budget: € 165,000.00 Measure 1: € 100,000.00 Measure 2: € 65,000.00
18
Measure 1 - Main results : - Initial analysis of environmental weakness and performances of an area belonging to a Local Tourist System; - Drafting two definitive projects concerning intervention stressed by the environmental analysis (moving some campings from the coastline; planning a sustainable transport plan).
19
Measure 2 - Main results The analysis of the environmental performances of 4 tourist firms; The adoption of working plans of the interventions that the environemntal analysis showed as priorities, aimed to the adoption of EMSs
20
Action d) Agriculture/Environment This action co-finances projects that merge agriculture and environment by means of renawable energy sources: woodchips
21
Type of project: Plantation of hedgerows and buffer strips To support their use for woodchip production To create an agro-energetic supply chain
22
Axis II Local Plans for Sustainable Devolopment of special areas (environmental problems, settlement congestion, sometimes related to crisis in some productive sector or district)
23
3 projects were co-financed Each of them was co-financed by Marche Region with a sum of € 150,000.00
24
Axis III Funding pilot projects Innovative approach to pursue sustainable development in the regional territory Ex. Project concerning urban planning or EMAS for Local Authorities