I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA
2
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project
4
Concept 1 Pavement reconstruction from Keystone Ave. to 4 th St. Keystone Ave. 4 th St.
5
Existing Pavement Conditions
7
Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements
8
ITS Devices Dynamic Message Signs (DMS) Travel Time Signs (TTS) Also Flow Detectors CCTV Intelligent Transportation System Benefits Quicker Incident Response Times Informing the Motorists of Accidents and Travel Times TRIP RELIABILITY
9
Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements
10
Existing Sign Conditions
11
Concept 4 and 5 Concept 4 Restripe I-80 EB to I-580 SB on-ramp Concept 5 Widen Virginia St. WB off-ramp to two lanes
12
Widen E. McCarran Blvd. EB off-ramp Concept 6
13
Storm Drain System Improvements at Robb Drive EB on-ramp to I-80 Concept 7
14
Concept 8 Sparks Blvd. NB to WB I-80 Loop Ramp EB to NB triple lefts
15
Concept 9 Auxiliary lanes from E. McCarran Blvd to Vista Blvd.
16
Concept 10 Widen Rock Blvd. EB off-ramp
17
Concept 11 Widen Robb Dr. WB off-ramp
18
keeprenosparksmoving.com Traffic alerts Customize your Commute Live cameras Alternate routes Construction info Photos
19
I-80 ROBB DRIVE TO VISTA BOULEVARD LANDSCAPE & AESTHETICS
20
Robb Dr. Vista Blvd. McCarran Blvd. West Sparks Blvd. US-395 Pyramid Way Rock Blvd. Kietzke Lane Evans Ave. Ralston St. Keystone Ave. N. Wells Ave. Robb Drive
21
Vista Boulevard Robb Dr. Vista Blvd. McCarran Blvd. West Sparks Blvd. US-395 Pyramid Way Rock Blvd. Kietzke Lane Evans Ave. Ralston St. Keystone Ave. N. Wells Ave.
22
Tank Farm Screening
23
July 2011
24
August 2011
25
September 2011
29
Design will be completed by December, 2011. The westbound PCCP will be complete this year The eastbound PCCP work will begin spring, 2012 Overall project will be completed by December, 2012 Project Status
30
Questions? Thank you! Jeff Lerud, Project Manager 775-888-7589 jlerud@dot.state.nv.us