I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA.

Similar presentations


Presentation on theme: "I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA."— Presentation transcript:

1 I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA

2 I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project

3

4 Concept 1 Pavement reconstruction from Keystone Ave. to 4 th St. Keystone Ave. 4 th St.

5 Existing Pavement Conditions

6

7 Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements

8 ITS Devices  Dynamic Message Signs (DMS)  Travel Time Signs (TTS)  Also  Flow Detectors  CCTV Intelligent Transportation System Benefits  Quicker Incident Response Times  Informing the Motorists of Accidents and Travel Times  TRIP RELIABILITY

9 Concept 2 and 3 Concept 2: Intelligent Transportation System (ITS) Concept 3: Signing and Striping Improvements

10 Existing Sign Conditions

11 Concept 4 and 5 Concept 4 Restripe I-80 EB to I-580 SB on-ramp Concept 5 Widen Virginia St. WB off-ramp to two lanes

12 Widen E. McCarran Blvd. EB off-ramp Concept 6

13 Storm Drain System Improvements at Robb Drive EB on-ramp to I-80 Concept 7

14 Concept 8 Sparks Blvd. NB to WB I-80 Loop Ramp EB to NB triple lefts

15 Concept 9 Auxiliary lanes from E. McCarran Blvd to Vista Blvd.

16 Concept 10 Widen Rock Blvd. EB off-ramp

17 Concept 11 Widen Robb Dr. WB off-ramp

18 keeprenosparksmoving.com  Traffic alerts  Customize your Commute  Live cameras  Alternate routes  Construction info  Photos

19 I-80 ROBB DRIVE TO VISTA BOULEVARD LANDSCAPE & AESTHETICS

20 Robb Dr. Vista Blvd. McCarran Blvd. West Sparks Blvd. US-395 Pyramid Way Rock Blvd. Kietzke Lane Evans Ave. Ralston St. Keystone Ave. N. Wells Ave. Robb Drive

21 Vista Boulevard Robb Dr. Vista Blvd. McCarran Blvd. West Sparks Blvd. US-395 Pyramid Way Rock Blvd. Kietzke Lane Evans Ave. Ralston St. Keystone Ave. N. Wells Ave.

22 Tank Farm Screening

23 July 2011

24 August 2011

25 September 2011

26

27

28

29 Design will be completed by December, 2011. The westbound PCCP will be complete this year The eastbound PCCP work will begin spring, 2012 Overall project will be completed by December, 2012 Project Status

30 Questions? Thank you! Jeff Lerud, Project Manager 775-888-7589 jlerud@dot.state.nv.us


Download ppt "I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, PE, CPM Project Manager APWA."

Similar presentations


Ads by Google