Canoe Creek Penstock and the Use of Pipe Couplers John Ebell Project Manager Barkley Project Group.

Similar presentations


Presentation on theme: "Canoe Creek Penstock and the Use of Pipe Couplers John Ebell Project Manager Barkley Project Group."— Presentation transcript:

1 Canoe Creek Penstock and the Use of Pipe Couplers John Ebell Project Manager Barkley Project Group

2

3

4

5 1850 m of 36” coupled penstock

6 Off-site preparation

7 Rolled grove couplers 0 – 300 psi (103 used) Welded ring couplers 0 – 600 psi (51 Used)

8 Used Gas Pipeline

9

10 Completion of 3 – 5 joints per day

11 Pipe installation within the narrow road / pipe allowance

12 Minimize construction footprint

13 Backfilled with crushed 3” minus

14 Finished Access Road

15 Assembly time 10 – 20 minutes

16 Increased opportunity for local work force Minimizes specialized trades

17

18 Rapid pipe assembly on adverse sites

19 Avoids confined-space entry

20 Alignment tabs

21 John Ebell Barkley Project Group 250 390 2627 Scott McDonald Victaulic Canada 604 992 1600