Canoe Creek Penstock and the Use of Pipe Couplers John Ebell Project Manager Barkley Project Group
5
1850 m of 36” coupled penstock
6
Off-site preparation
7
Rolled grove couplers 0 – 300 psi (103 used) Welded ring couplers 0 – 600 psi (51 Used)
8
Used Gas Pipeline
10
Completion of 3 – 5 joints per day
11
Pipe installation within the narrow road / pipe allowance
12
Minimize construction footprint
13
Backfilled with crushed 3” minus
14
Finished Access Road
15
Assembly time 10 – 20 minutes
16
Increased opportunity for local work force Minimizes specialized trades
18
Rapid pipe assembly on adverse sites
19
Avoids confined-space entry
20
Alignment tabs
21
John Ebell Barkley Project Group 250 390 2627 Scott McDonald Victaulic Canada 604 992 1600