F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007
2
Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank
3
1)RFQ cold model end flange inserts Due for delivery on September 3 rd but anticipate a delay of approx. one week.
4
Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank
6
Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank
7
The FETS support stands in R8
8
The FETS support stand with rails
9
Beam Floor to centre of beam = 1650mm Rail diameter = 50mm Rail spacing = 800mm Floor to centre of rail = 800mm The FETS support stands main parameters
10
The FETS support stands vee blocks Corner vee block – 4 per stand Mid vee block – where needed Due for delivery on September 10 th.
11
Activities: 1) RFQ cold model end flange inserts 2) RFQ cold model couplers 3) FETS support stand rail system 4) Laserwire beam profile measurement tank
12
Design concept of the laserwire beam profile measurement tank Layout of four ALIO linear/rotary stages Beam pipe Beam
13
Design concept of the laserwire beam profile measurement tank Solenoid Faraday cup
14
Post acceleration conceptual design