Presentation is loading. Please wait.

Presentation is loading. Please wait.

T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network.

Similar presentations


Presentation on theme: "T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network."— Presentation transcript:

1 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 1 LCLS Undulator Week@SLAC Undulator Network Status Controls (1300 hrs, Redwood Rm A/B)

2 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 2 Agenda Accelerator Network Infrastructure supports I&C Ethernet and MPS Design Overview Cable Plant Davis Bacon Phase IV & Phase V Contracts Fiber Termination Contract Integrating with other networks: Alignment Diagnostics System Network: G. Gassner Conventional Facilities: J. Sevilla Photon Sections: G. Haller SLAC Scientific Computing and Computing Services (SCCS) centralized networking groups are helping with all networks

3 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 3 Network Design Accelerator Switches reside in service buildings 913 and 921 to reduce heatload B913: UIR 1-15 B921: UIR 16-33 3 cat6 cables to each UIR: CA ethernet, power reset, console port Cat6 longhauls between service building patch panels and cat6 boxes at racks 4 walkup stations: one each COW and wireless Other IOCs are located in service buildings: MPS, BPM, etc. Fiber Trunks support ethernet switches and MPS

4 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 4 Davis Bacon & Fiber Contracts Phase IV: install and test cat6 longhauls LNET14 is UIR cables Phase V: fiber pull Fiber Termination Contract: terminate and test fibers

5 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 5 Phase IV Cable Plant Schedule

6 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 6

7 T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status lahey@slac.stanford.edu 1/22/08 7 Activate Connections Commission Switches Install jumper cables


Download ppt "T. Lahey, M. de Salvo, SCCS networking Undulator Accelerator Network Status 1/22/08 1 LCLS Undulator Undulator Network."

Similar presentations


Ads by Google