April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
2
2 Comply with state drinking water program requirements Long term guidance document – Identify current system deficiencies – Plan for facility upgrades – Plan for service area growth and expansion
3
3 Document existing water system Estimate service area growth and future water needs through 20 years Establish criteria for water system performance & identify deficiencies Identify needed improvement projects Develop capital improvement program
4
4 Current supply from Willamette River Water Treatment Plant (WRWTP) – Meets existing peak demand – Existing city wells provide emergency supply – No need to continue purchasing water from Portland Future supply anticipated from WRWTP
5
5 Storage Reservoirs & Pump Stations – Adequate to meet projected demands through 20 years – Some new pump stations needed to serve growth beyond 20 years Distribution Piping – Hydraulic model used to identify piping deficiencies based on fire flow capacity and pressure
6
6 Water Supply – WRWTP upgrades to serve existing and future customers – WRWTP capacity expansion for growth Pump Stations – New stations proposed beyond 20-years to supply long term growth Planning and Operation – SCADA system upgrade – Resiliency Plan
7
7 Provides road map for needed water system upgrades and projects to serve growth when and if it occurs CIP prioritization reviewed annually through Sherwood budget process
8
8 All CIP improvements - $36.2 million