U.S. ATLAS Project Overview John Huth Harvard University LHC Computing Review FNAL November 2001
2
November 01 John Huth, LHC Computing 2 Outline International and U.S. ATLAS Organization U.S. ATLAS External Groups Project Management Plan Milestones Status Software Facilities Grid efforts Physics Funding Profile Impact
3
November 01 John Huth, LHC Computing 3 International ATLAS Computing Oversight Board Computing Steering Group Matrix of detector/task orientation PBS structure gives tasks, schedules, resource loading Maps directly onto U.S. ATLAS WBS Planning officer is now Torre Wenaus (U.S. ATLAS SW Mgr.) Software deliverables delineated in Software Agreements Major milestones associated with releases, data challenges Data Challenge coordinator: Gilbert Poulard (CERN)
4
November 01 John Huth, LHC Computing 4 ATLAS Detector/Task matrix Offline Coordinator ReconstructionSimulationDatabaseChair N. McCubbin D. Rousseau K. Amako D. Malon Inner Detector D. Barberis D. Rousseau F. Luehring S. Bentvelsen Liquid Argon J. Collot S. Rajagopalan M. Leltchouk S. Simion/ R. Sobie Tile Calorimeter A. Solodkov F. Merritt A. Solodkov T. LeCompte Muon To Be Named J.F. Laporte A. Rimoldi S. Goldfarb LVL 2 Trigger/ Trigger DAQ S. George S. Tapprogge M. Weilers A. Amorim Event Filter F. Touchard M. Bosman Physics Coordinator: F.Gianotti Chief Architect: D.Quarrie
5
November 01 John Huth, LHC Computing 5 International ATLAS Computing Org. simulationreconstructiondatabasecoordinator QC groupsimulation reconstruction databaseArch. team Event filter Technical Group National Comp. Board Comp. Steering Group Physics Comp. Oversight Board Detector system
6
November 01 John Huth, LHC Computing 6 Recent Events Progress toward coherent, integrated effort First Software Agreement Signed! (Control/framework) Second one in progress (QA/AC) Data Challenge Coordinator named (Gilbert Poulard) Lund physics meeting (Lund Athena release) ARC Report Endorsement of Athena Upcoming Data Challenge 0 Continuity test – November Athena release Personnel Changes D. Malon now solo data management leader Helge Meinhard – planning, moves to IT Division Now replaced by Torre Wenaus
7
November 01 John Huth, LHC Computing 7 Project Core SW FTE
8
November 01 John Huth, LHC Computing 8 FTE Fraction of Core SW
9
November 01 John Huth, LHC Computing 9 U.S. ATLAS Goals Deliverables to International ATLAS and LHC projects Software Control/framework (SW agreement signed) Portion of data management Event Store Collaboratory tools Detector subsystem reconstruction Grid integration Computing resources devoted to data analysis, simulation Tier 1, Tier 2 centers Support of U.S. ATLAS Physicists Computing resources Support functions (librarian, nightly builds, site support)
10
November 01 John Huth, LHC Computing 10 U.S. ATLAS Project
11
November 01 John Huth, LHC Computing 11 Project Management Plan New version: extensive revisions from last year Description of institutional MOU’s Two draft Inst. MOU’s exist Liaison list Performance metrics established Personnel effort - FTE Hardware – fraction of turn-on functional per year Change control Reporting Quarterly reports Transition to “Research Program” in FY 07
12
November 01 John Huth, LHC Computing 12 U.S. ATLAS WBS Structure 2.1Physics Support of event generators Data challenge support in U.S. 2.2 Software Core Software (framework, database) Subsystem efforts Training 2.3 Facilities Tier 1 Tier 2, infrastructure (networking) 2.4 Project Management
13
November 01 John Huth, LHC Computing 13 U.S. ATLAS Developments Athena (control/framework) Lund release done DC 0 release Incorporation of G4 interface Database Effort augmented Coordination of Oracle,Obj, Root evaluations Facilities Ramp delayed by funding profile, DC preparation reduced scope Common grid plan worked out Modest personnel ramp – BNL SW/Fac/ANL Librarian support, nightly builds at BNL (from CERN)
14
November 01 John Huth, LHC Computing 14 External Groups iVDGL funding (Tier 2 personnel, Hardware) approved But 50% cut in hardware relative to original planning PPDG effort in progress ITR funding of Indiana (grid telemetry) Integrated planning on software, facilities for grids Liaisons named in PMP GriPhyN/iVDGL – R. Gardner (J. Schopf CS liaison) PPDG – T. Wenaus (J. Schopf CS liaison) EU Data grid – C. Tull HEP Networking – S. McKee
15
November 01 John Huth, LHC Computing 15 Software Migration from SRT to CMT begun Effort redirection, but long term benefit Upcoming Nov. Release of Athena Support of DC 0 Funding shortfall impacts Shift of D. Day (USDP, Python scripting) – postdoc hire to fill FY 03 delay hire at BNL possible – loss of ROOT expertise Data management architecture proposed (non product specific) Root I/O service G4 Integration into Athena Development of “pacman” for deployment of software (BU) at remote sites
16
November 01 John Huth, LHC Computing 16 Facilities Schedule LHC start-up projected to be a year later 2005/2006 2006/2007 30% facility in 06 100% facility in 07 ATLAS Data Challenges (DC’s) have, so far, stayed fixed DC0 – Nov/Dec 2001 – 10 5 events Software continuity test DC1 – Feb/Jul 2002 – 10 7 events ~1% scale test Data used for US ATLAS Grid testbed integration tests DC2 – Jan/Sep 2003 – 10 8 events ~10% scale test A serious functionality & capacity exercise A high level of US ATLAS facilities participation is deemed very important
17
November 01 John Huth, LHC Computing 17 Facilities Tier 1 particularly hard hit by budget shortfall Delays in hiring Scalable online storage prototype work delayed approx. 7 mos. DC2 capability reduced relative to plan (1 vs. 5%) Small increments ($300k) can help substantially Year end funding of $284k from DOE (Aug 01) Major usage of Tier 1 for shielding calculations Anticipate major usage in DC’s and in grid tests Examination of tape vs. disk for event store at start of data taking Tier 2 Selection of first prototype centers (I.U., B.U.) iVDGL funding of prototype hardware Deployment of SW on testbed sites in progress
18
November 01 John Huth, LHC Computing 18 CPU Capacity (kSi95)
19
November 01 John Huth, LHC Computing 19 US ATLAS Persistent Grid Testbed Calren Esnet, Abilene, Nton Esnet, Mren UC Berkeley LBNL-NERSC Esnet NPACI, Abilene Brookhaven National Laboratory Indiana University Boston University Argonne National Laboratory U Michigan Oklahoma University Abilene Prototype Tier 2s HPSS sites
20
November 01 John Huth, LHC Computing 20 Grid Efforts/Physics Many sources of effort/shared GriPhyN/iVDGL/PPDG/EU activities/New CERN mgmt. Common U.S. ATLAS plan Use existing tools as much as possible Use existing platforms as much as possible Gain experience in Replica catalog Metadata description Deployment/release of tools Philosophy is to gain expertise, not await a grand international synthesis Physics: support hire for generator interface, data challenge
21
November 01 John Huth, LHC Computing 21 Networking Networking is a crucial component for the success of the grid model of distributed computing This has not been included as part of project funding profile Agency guidance Nevertheless, it must be planned for Transatlantic planning group report (H. Newman, L. Price) Tier 1- Tier 2 connectivity requirements See talk by S. McKee Scale and requirements are being established Funding sources must be identified
22
November 01 John Huth, LHC Computing 22 Major Milestones
23
November 01 John Huth, LHC Computing 23 Comments on Budgeting Agencies so far have worked hard to come up the profile, but, given budget issues, this had been difficult, have come up short Construction project borrowing We cannot plan based on our wishes, but rather realistic expectations Current budgeting profile Increase in grid activities – long term benefit/short term redirection of effort Need to factor in networking costs for Tier 1-Tier 2 connections (note: Transatlantic report) – via external funds, but must be budgeted Relief in form of overall NSF funding for “research program” Overall profile for M+O, upgrades and computing Major components in computing: Tier 2 sites, grid integration with ATLAS software SW Professionals located at CERN (hires through universities)
24
November 01 John Huth, LHC Computing 24 Funding Guidance
25
November 01 John Huth, LHC Computing 25 Budget Profile by Item
26
November 01 John Huth, LHC Computing 26
27
November 01 John Huth, LHC Computing 27 FTE Profile
28
November 01 John Huth, LHC Computing 28 FTE by Category in 02
29
November 01 John Huth, LHC Computing 29 FTE’s in 07
30
November 01 John Huth, LHC Computing 30 Matching of Profiles
31
November 01 John Huth, LHC Computing 31 Risks Software Loss of expertise in control/framework (scripting) New hire as mitigation Loss of Ed Frank (U. Chicago) – data management Delay of new hire at BNL – ROOT persistency expertise Support questions in tools (e.g. CMT) Facilities Slowed ramp-up in personnel, hardware Facility preparation for DC2 implies reduced scale Grid Some shift of effort from core areas into grid developments – following the development of integrated model of comp. centers
32
November 01 John Huth, LHC Computing 32 NSF Proposal Covers Computing, upgrades and M+O Computing: 3 Software FTE’s – located at CERN (hire by University) Alleviates shortfall of 2 FTE, covers remaining portion in out years Physics support person Support of generator interfaces, data challenges Main source of Tier 2 funding Tier 2 hardware Personnel Common (w/ US CMS) team to debug last mile networking problems Alleviates shortfalls in the program N.B. this also frees up DOE funds for labs, allowing a better Tier 1 ramp, preparation for data challenges.
33
November 01 John Huth, LHC Computing 33
34
November 01 John Huth, LHC Computing 34 Summary Much progress on many fronts Funding profile is still an issue Personnel ramp Ramp of facility Some possible solutions Funds for loan payback are incremental “Research Program” NSF proposal is necessary Progress in International collaboration Software agreements The single biggest help from the committee would be a favorable recommendation on the computing request in the NSF proposal In addition, endorsement of proposed project scope, schedule, budgets and management plan.