Download presentation
Presentation is loading. Please wait.
Published byPhoebe Robbins Modified over 9 years ago
1
MEDIA 2009-2010
2
Planning, Budgeting, and Accountability Presentation to I.T. MEDIA 2009-2010
3
EMPLOYEES 3FTE (-2) = 1 6PTE 2 SH (soft funded) Staging
4
1. MEDIA TECHNOLOGY SUPPORT & SERVICES 2. MEDIA TECHNOLOGY MAINTINANCE 3. MEDIA INTRASTRUCTURE & ENGINEERING 4. MEDIA CONSULTATION
5
2008-2009 PBA REPORT IT: WE DID NOT ASK FOR ANYTHING BUT MENTIONED THE SAME ITEMS WE REQEUSTED THROUGH ACADEMICS
6
2008-2009 PBA REPORT ACADEMICS AND OTHER PBA’S: 1. 6-7 YEAR EQUIPMENT REPLACMENT CYCLE 2. 1 FTE TECHNITION Other: STUDENT RESPONSE SYSTEMS DIGITAL SIGNAGE VIDEO SURVLANCE PBA REPORT
7
2008-2009PBA REPORT ACCADEMICS: ONGOING 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (FIVETH REQEUST) PARTIAL FUNDED DIGITAL SIGNAGE VP FUNDING PTE POSSITON(DAVE & 40 LOCATIONS) VIDEO SURVLANCE MEDIA DID CONSULTING AND SEMI FUNDED THROUGH BUILDING BUDGET & FACILITIES (230 CAMERAS) REQUEST NOT MET 6-7 YEAR EQUIPMENT REPLACMENT CYCLE MEDIA ENHANCED CLASSROOM UPGRADES 2008-2009 PBA
8
2008-2009 ONGONG MONEY RECEIVED THOUGH PBA: 1 FTE TECHNITION (NOT HIRED) (2 SOFT FUNDED STUDENT HOURLY) DEPARTMENT RESTRUCTURE JOB DISCRIPTION CARREER LADDER RESLOTTING OTHER HR ITEMS PBA REPORT
9
2005-2006 ONGONG MONEY RECEIVED THOUGH PBA: ACCADEMIC MEDIA FUNDING 70K 7 MEDIA ENHANCED CLASSROOMS AND MAINTIANING OF EXISTING SYTEMS CAMPUS BULBS AND MAINTINANCE PAST ONGOING PBA FUNDS REPORT
10
2007-2008 ONGONG MONEY RECEIVED THOUGH VP’S: DSS MEDIA FUNDING 30K 1 PTE CURRENT 49 DISPLAYS AT 45 LOCATION OTHER FUNDS AND SCPECIAL PROJECTS
11
ACHEIVMENTS LC DSS VSS
12
1.) 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (Fifth Request) 2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US) 100% MEDIA ENHANCED CLASSROOM Other PBA Request that have to do with Media: 3.) Interactive Digital Signage 8K per location (Main Entrances) 4.) Commercial Free Content for Campus Entertainment Displays and Cable System (This will solve copy- write issues and un-commercialize signage) PBA REQUESTS
13
1.) 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (4) 2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US) 100% MEDIA ENHANCED CLASSROOMS PBA REQUESTS
14
2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US.) 100% MEDIA ENHANCED CLASSROOMS DEPARTMENT RESTURCTURE FTE RESLOTTING (Use Academic Media Funds) PTE TO FTE AS PART OF RESTURCTURE 7 Year replacement cycle Additional support and maintenance funds. (See PowerPoint Presentation: 100% MEC 09-10 FINAL) PBA REQUESTS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.