Presentation is loading. Please wait.

Presentation is loading. Please wait.

MEDIA 2009-2010. Planning, Budgeting, and Accountability Presentation to I.T. MEDIA 2009-2010.

Similar presentations


Presentation on theme: "MEDIA 2009-2010. Planning, Budgeting, and Accountability Presentation to I.T. MEDIA 2009-2010."— Presentation transcript:

1 MEDIA 2009-2010

2 Planning, Budgeting, and Accountability Presentation to I.T. MEDIA 2009-2010

3 EMPLOYEES 3FTE (-2) = 1 6PTE 2 SH (soft funded) Staging

4 1. MEDIA TECHNOLOGY SUPPORT & SERVICES 2. MEDIA TECHNOLOGY MAINTINANCE 3. MEDIA INTRASTRUCTURE & ENGINEERING 4. MEDIA CONSULTATION

5 2008-2009 PBA REPORT IT: WE DID NOT ASK FOR ANYTHING BUT MENTIONED THE SAME ITEMS WE REQEUSTED THROUGH ACADEMICS

6 2008-2009 PBA REPORT ACADEMICS AND OTHER PBA’S: 1. 6-7 YEAR EQUIPMENT REPLACMENT CYCLE 2. 1 FTE TECHNITION Other: STUDENT RESPONSE SYSTEMS DIGITAL SIGNAGE VIDEO SURVLANCE PBA REPORT

7 2008-2009PBA REPORT ACCADEMICS: ONGOING 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (FIVETH REQEUST) PARTIAL FUNDED DIGITAL SIGNAGE VP FUNDING PTE POSSITON(DAVE & 40 LOCATIONS) VIDEO SURVLANCE MEDIA DID CONSULTING AND SEMI FUNDED THROUGH BUILDING BUDGET & FACILITIES (230 CAMERAS) REQUEST NOT MET 6-7 YEAR EQUIPMENT REPLACMENT CYCLE MEDIA ENHANCED CLASSROOM UPGRADES 2008-2009 PBA

8 2008-2009 ONGONG MONEY RECEIVED THOUGH PBA: 1 FTE TECHNITION (NOT HIRED) (2 SOFT FUNDED STUDENT HOURLY)  DEPARTMENT RESTRUCTURE  JOB DISCRIPTION  CARREER LADDER  RESLOTTING  OTHER HR ITEMS PBA REPORT

9 2005-2006 ONGONG MONEY RECEIVED THOUGH PBA: ACCADEMIC MEDIA FUNDING 70K  7 MEDIA ENHANCED CLASSROOMS AND MAINTIANING OF EXISTING SYTEMS  CAMPUS BULBS AND MAINTINANCE PAST ONGOING PBA FUNDS REPORT

10 2007-2008 ONGONG MONEY RECEIVED THOUGH VP’S: DSS MEDIA FUNDING 30K  1 PTE  CURRENT 49 DISPLAYS AT 45 LOCATION OTHER FUNDS AND SCPECIAL PROJECTS

11 ACHEIVMENTS LC DSS VSS

12 1.) 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (Fifth Request) 2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US)  100% MEDIA ENHANCED CLASSROOM Other PBA Request that have to do with Media: 3.) Interactive Digital Signage 8K per location (Main Entrances) 4.) Commercial Free Content for Campus Entertainment Displays and Cable System (This will solve copy- write issues and un-commercialize signage) PBA REQUESTS

13 1.) 6-7 YEAR EQUIPMENT REPLACMENT CYCLE (4) 2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US)  100% MEDIA ENHANCED CLASSROOMS PBA REQUESTS

14 2.) MEANS TO SUPPORT OTHER PBA REQUESTS (THAT HAVE TO DO WITH US.) 100% MEDIA ENHANCED CLASSROOMS  DEPARTMENT RESTURCTURE  FTE RESLOTTING (Use Academic Media Funds)  PTE TO FTE AS PART OF RESTURCTURE  7 Year replacement cycle  Additional support and maintenance funds. (See PowerPoint Presentation: 100% MEC 09-10 FINAL) PBA REQUESTS

15


Download ppt "MEDIA 2009-2010. Planning, Budgeting, and Accountability Presentation to I.T. MEDIA 2009-2010."