Download presentation
Presentation is loading. Please wait.
Published byBenedict Stevens Modified over 9 years ago
1
UNCLASSIFIED NDIA CPM 01/13/10 Page-1 Streamlining Program Reviews Terry Jaggers Principle Director, Systems Engineering Office of the Director, Defense Research and Engineering NDIA Committee on Program Management 13 January 2010
2
UNCLASSIFIED NDIA CPM 01/13/10 Page-2 AF Problem 2 ½ Years Ago… OSD PSR (ACAT IDs) Space IPA (NSS 03-01) Late-to-Need SEPs OSD Independent TRAs Emerging MRAs PEO Sufficiency Reviews Emerging LHAs and ILAs Integration Readiness/D&SWS SEAM/CMMI Process Tools Other (MIRT, CAIG & SRA) SAE Review Board Mtg (IC/D) (Independent) (Integrated/Independent) THEN (Unsustainable, begin NRC study) Issues & Concenrs: Specialty reviews proliferating at an alarming rate (TRAs, MRAs, IRAs, PSRs, IPAs, PMAG, D&SWS, SEPs, PESHEs, RMAs, etc.) OSD PSR focused on assessing ACAT ID programs only SAE’s AF Review Board lacked underpinning process to assess and prepare SAE like PSR did DAE PEO sufficiency reviews not validated, transparent nor accepted by others PMs burdened due to lack of synchronization to key program events and multiple review teams TRAs and other specialty reviews out of context of systems engineering and integration assessment Training courses being developed ad hoc with no system level view on “integrated” training & education to assess/review AF missing golden opportunities to enhance, grow and train organic acquisition workforce
3
UNCLASSIFIED NDIA CPM 01/13/10 Page-3 AF Commissioned NRC Study Statement of Task Review the program technical reviews and assessments that space and non-space system acquisition programs are required to undergo Assess each review and the resources required to accomplish it. Assess the role and contribution that each review and the combined reviews make to successful acquisition. Identify cases where different reviews have shared, common, or overlapping goals, objectives, content, or requirements. Identify and evaluate options for streamlining, tailoring, integrating, or consolidating reviews. Recommend changes that the Air Force and DOD should make to the reviews.
4
UNCLASSIFIED NDIA CPM 01/13/10 Page-4 NRC Study Outbrief Study & Recommendations to be Briefed by Rand Fisher Here
5
UNCLASSIFIED NDIA CPM 01/13/10 Page-5 AF [Chief Engineer] Actions Conduct joint DDR&E-SAF/AQR PSRs on ACAT 1Ds and run pilot on SDB II Program Adopt/standardize OSD PSR methodology (DAPS) for use across AF (ACAT 1C, II and IIIs) Incorporate specialty technical reviews (TRAs, MRAs, LHAs, etc) under overarching AF PSR review process Added a “mentoring/help” phase at front end of AF PSR process (start when TRA starts) Added cost estimation (CAIG), PM center of excellence (schedules) and contracting (MIRT) POCs to AF PSR team 5
6
UNCLASSIFIED NDIA CPM 01/13/10 Page-6 Challenges & Opportunities for DoD Independent Milestone Reviews (PSRs, TRAs, CAIG, Space IPAs, etc) As-Required Program Assistance (Prog Assist, Peer Reviews, Space PMAG, etc) Continuous Execution Reviews (DAES, EVMS, POPs, Etc) DAES DABs CSBs SRCA Synchronizing/coupling reviews for effectiveness and efficiencies (PM currently tries…) Architecting the data capture for SRCA (will PARCA do this?) Standardizing reviews between OSD and Services (AF attempting to synergize OSD-AF tech effort in overall program review initiatives) Pushing reviews earlier per 5000 and WSARA (MDD and MS A voids) Reviewing gaps / overlaps in data capture between DAPS, TRAs, POPs, EVMS, etc (Univ of Tenn started)
7
UNCLASSIFIED NDIA CPM 01/13/10 Page-7 Summary DDR&E synergizing independent technical reviews –Specialty reviews (IRA, TRA, MRA, etc) –Helpful/mentoring opportunities (early engagement at TRA start) –Colloaboration with Component reviews/SMEs –Pushing to the left for MS A and MDD prep More needs to be done to synergize other reviews –Functionals (cost, contracting, test, logistics, etc) –Type (program assist, execution, decision prep) –Data collection/disposition (SRCA and PARCA) Opportunities exist to “architect” reviews smartly –Reduce program office resources –Reduce review team resources –Optimize SRCA data and resources
8
UNCLASSIFIED NDIA CPM 01/13/10 Page-8 Backup
9
UNCLASSIFIED NDIA CPM 01/13/10 Page-9 ACB MDD O&S FRP DR PDRCDR ACAT 3 Development Development Planning AC CBA B ICD Technology Development Engineering and Manufacturing Development Production and Deployment Materiel Solution Analysis MDD CPDCDD O&S FRP DR PDRCDR Historical: majority of PSRs performed around EMD for ACAT 1 Current focus: Pushing to left Desire end state: (1) Extend review and analysis capability to Services (2) Get ACAT 2&3 participation (3) Push PSRs “to the left” because that’s where program problems are born (4) Link Competency Model to SRCA results ACB MDD O&S FRP DR PDRCDR ACAT 1 ACAT 2 Policy/Guidance Education & Training Best Practices Other Processes (JCIDS, etc) Oversight (DAB/ITAB) Competency Model AOA SRCA Results Show SE’s PSR & SRCA Vision
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.