2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.

Similar presentations


Presentation on theme: "2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation."— Presentation transcript:

1 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

2 Intelligent Transportation Systems The technology tools and systems that local agencies and jurisdictions use to manage transportation operations and to increase safety and efficiency

3 The Regional ITS Plan Purpose: Identify existing and future ITS communications networks and devices needed to enhance transportation and economic competitiveness throughout the region Vision: Implement a regional ITS network to maximize the safety and efficiency of transportation in the region

4 Regional Loop Fiber optic ring along US 98 to SR 231 in Bay County, north to I-10, west on I-10 to I-110 in Escambia County, and south on I-110 to US 98 ▫784,000 of 822,935 linear feet of fiber optic cable completed or currently being installed

5

6 Florida-Alabama TPO ITS working group made up of representatives from: ▫Escambia County ▫Santa Rosa County ▫City of Milton ▫City of Gulf Breeze ▫City of Pensacola ▫FDOT Conducting a feasibility study and ITS Implementation Plan for development and operations of an Advanced Transportation Management System

7 Okaloosa-Walton TPO – Okaloosa County Travel time monitoring system installed at four intersections on US 98 to assist with the Cody Avenue fly-over project ▫Parish Blvd, Florosa Elem, Cody Ave, Doolittle Blvd 10 CCTV’s installed at various locations throughout the County 6 radar type detection systems installed 8 battery back-up systems for traffic signals installed

8 Okaloosa-Walton TPO – Walton County Walton County has entered into a Joint Participation Agreement with FDOT to fund a traffic engineer ▫Facilitate ITS deployment in Walton County ▫Maximize capabilities of existing signal system ▫Procure additional resources to support ITS implementation

9 Bay County TPO Recent Projects: ▫Two adaptive traffic control systems installed  Panama City Beach Parkway from SR 79 to Woodlawn Drive  23 rd Street from SR 77 to Lisenby Avenue ▫Extended the fiber optic system north along SR 79 from Panama City Beach Parkway to SR 388 Total System: ▫137 intersections running in the ITS system ▫86 pan/tilt/zoom cameras ▫4 Dynamic Messaging Systems ▫2 remote weather stations

10 Questions? Kate Daniel, Regional Planner Kate.Daniel@wfrpc.org (850) 332-7976 ext. 245


Download ppt "2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation."

Similar presentations


Ads by Google