Download presentation
Presentation is loading. Please wait.
Published byHilda Hicks Modified over 9 years ago
1
1234 Dec 2006 1234 Jan 2007 1234 Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14 Beam Test @ DESY Feb 26 ~ Mar 30 Test assembly Install LED/Temp. monitor system Prepare shipping Ship MPPCs to KNU MPPC mass check. MPPC soldering Direct-readout megastrip source scan Install LED Delivery of 500 MPPCs Megastrip assembly Fabrication of megastrip layer components Prepare MPPC mass check system KEK Megastrip bench test Fabrication of Frame / light shielding structure Finalize module design MPPC study (response curve) Contact DESY (DC gas, safety issue, etc) Schedule toward the SC-ECAL Beam Test @ DESY Establish LED / Temperature monitoring system Analysis code / Event display Prepare Trigger / Veto counters
2
Measure MPPC response curve, check variation ECAL module construction –Make mega-strip layer assembly ECAL frame and light shield construction MPPC mass measurement Mega-strip source scan Establish / install LED monitoring system Establish / install temperature monitoring system Shipping Settle MPPC operation voltages, prepare table for voltage adjustment Trigger counters / Veto counter (need positive-polarity signal) Make measurement plan / schedule Contact DESY (stage, drift chamber ) Jobs toward the SC-ECAL Beam Test @ DESY
3
DAQ ace Data analysis software / ntuplization Drift chamber operation and analysis MIP calibration analysis Gain calculation (MPPC and electronics inter-calibration) Online data monitoring (check pedestal, dead channel, etc) Quick result of energy spectra / resolution Temperature / LED monitoring data, correction Event display MPPC dose test Jobs during the Beam Test
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.