Download presentation
Presentation is loading. Please wait.
Published byWarren Campbell Modified over 9 years ago
1
Zprávy z ATLAS SW Week March 2004 Seminář ATLAS SW CZ Duben 2004 Jiří Chudoba FzÚ AV CR
2
Dario Barberis: Introduction & News ATLAS Software & Computing Week - 1 Mar. 2004 ATLAS Computing Timeline POOL/SEAL release (done) ATLAS release 7 (with POOL persistency) (done) LCG-1 deployment (in progress) ATLAS complete Geant4 validation (done) ATLAS release 8 DC2 Phase 1: simulation production DC2 Phase 2: intensive reconstruction (the real challenge!) Combined test beams (barrel wedge) Computing Model paper Computing Memorandum of Understanding (moved to end 2004) ATLAS Computing TDR and LCG TDR DC3: produce data for PRR and test LCG-n Physics Readiness Report Start commissioning run GO! 2003 2004 2005 2006 2007 NOW
3
Dario Barberis: Introduction & News ATLAS Software & Computing Week - 1 Mar. 2004 3 Near-term Software Release Plan l 7.5.0: 14th Jan 2004 l 7.6.0: 4th Feb l 7.7.0: 25th Feb <- SPMB Decision 3rd Feb l 8.0.0: 17th Mar <- DC2 & CTB Simulation Release l 8.1.0: 7th Apr l 8.2.0: 28th Apr l 8.3.0: 19th May l 9.0.0: 9th Jun <- DC2 & CTB Reconstruction Release l 9.1.0: 30th Jun l 9.2.0: 21st Jul l 9.3.0: 11th Aug ⇐ 15th Feb: LAr Technical run starts ⇐ 1st May: Baseline DC-2 Simulation starts ⇐ 10th May: Testbeam starts ⇐ 1st Jul: Baseline DC-2 Reconstruction starts ⇐ 14th Jul: Complete Testbeam ⇐ 15th Jul: Baseline DC-2 Physics Analysis starts
4
Expected Major Milestones GEANT4 Simulation DC2 (in validation) Test Beam (underway) Pile-Up, Digitization in Athena (debugging) GeoModel Inner Detector, Muon Spectrometer Conversion to CLHEP Units (mm, MeV, [-pi,pi]) POOL/SEAL Persistency Bytestream Converters Preliminary Conditions Capabilities Other Stepping Stones Move to InstallArea jobOption.txt --> jobOption.py Distribution Kits Release 8
5
ATLAS DC2 ATLAS Software Workshop 2 March 2004 Gilbert Poulard CERN PH-ATC
6
DC2: goals At this stage the goal includes: Full use of Geant4; POOL; LCG applications Pile-up and digitization in Athena Deployment of the complete Event Data Model and the Detector Description Simulation of full ATLAS and 2004 combined Testbeam Test the calibration and alignment procedures Use widely the GRID middleware and tools Large scale physics analysis Computing model studies (document end 2004) Run as much as possible of the production on LCG-2
7
DC2 operation Consider DC2 as a three-part operation: o part I: production of simulated data (May-June 2004) needs Geant4, digitization and pile-up in Athena, POOL persistency “minimal” reconstruction just to validate simulation suite will run on any computing facilities we can get access to around the world o part II: test of Tier-0 operation (July 2004) needs full reconstruction software following RTF report design, definition of AODs and TAGs (calibration/alignment and) reconstruction will run on Tier-0 prototype as if data were coming from the online system (at 10% of the rate) output (ESD+AOD) will be distributed to Tier-1s in real time for analysis o part III: test of distributed analysis on the Grid (August-Oct. 2004) access to event and non-event data from anywhere in the world both in organized and chaotic ways o in parallel: run distributed reconstruction on simulated data
8
DC2: Scenario & Time scale September 03: Release7 March 17th: Release 8 (production) May 3 rd 04: July 1 st 04: “DC2” August 1 st : Put in place, understand & validate: Geant4; POOL; LCG applications Event Data Model Digitization; pile-up; byte-stream Conversion of DC1 data to POOL; large scale persistency tests and reconstruction Testing and validation Run test-production Start final validation Start simulation; Pile-up & digitization Event mixing Transfer data to CERN Intensive Reconstruction on “Tier0” Distribution of ESD & AOD Calibration; alignment Start Physics analysis Reprocessing
9
DC2 resources ProcessNo. of events Time duration CPU power Volume of data At CERN Off site monthskSI2kTB Simulation 10 7 260025520Phase I (May- June) Pile-up (*) Digitization 10 7 2400751560 Byte-stream 10 7 2(small)20 16 Total Phase I 10 7 210001204096 Reconstruction Tier-0 10 7 0.56005510Phase II (July) Reconstruction Tier-1 10 7 2600505 Total 10 7 13045111
10
Atlas Production System schema RB Chimera RB Task (Dataset) Partition Transf. Definition Task Transf. Definition + physics signature Executable name Release version signature Supervisor 1Supervisor 2Supervisor 4 US GridLCGNG Local Batch Task = [job]* Dataset = [partition]* JOB DESCRIPTION Human intervention Data Management System US Grid Executer LCG Executer NG Executer LSF Executer Supervisor 3 Job Run Info Location Hint (Task) Location Hint (Job) Job (Partition) AMI
11
Tiers in DC2 Tier-0 o 20% of simulation will be done at CERN o All data in ByteStream format (~16 TB) will be copied to CERN o Reconstruction will be done at CERN (in ~10 days). o Reconstruction output (ESD) will be exported in 2 copies from Tier-0 ( 2 X ~5 TB).
12
Tiers in DC2 Tier-1s will have to o Host simulated data produced by them or coming from Tier-2; plus ESD (& AOD) coming from Tier-0 o Run reconstruction in parallel to Tier-0 exercise (~2 months) This will include links to MCTruth Produce and host ESD and AOD o Provide access to the ATLAS V.O. members Tier-2s o Run simulation (and other components if they wish to) o Copy (replicate) their data to Tier-1 o ATLAS is committed to LCG All information should be entered into the relevant database and catalog
13
Core sites and commitments SiteImmediateLater CERN2001200 CNAF200500 FNAL10? FZK100? Nikhef124180 PIC100300 RAL70250 Taipei60? Russia3050 Prague1740 Budapest100? Totals864(+147)>2600(+>90) Initial LCG-2 core sites Other firm commitments Will bring in the other 20 LCG-1 sites as quickly as possible
14
Comments on schedule The change of the schedule has been “driven” by o ATLAS side: the readiness of the software Combined test beam has a highest priority The availability of the production tools The integration with grid is not always easy o Grid side The readiness of LCG We would prefer run Grid only! Priorities are not defined by ATLAS only For the Tier-0 exercise o It will be difficult to define the starting date before we have a better idea how work the “pile-up” and the “event-mixing” processes
15
Armin NAIRZ ATLAS Software Workshop, CERN, March 1-5, 2004 12 Generation and GEANT4 Simulation (as in Rel. 7.5.0+) are already in a production-like state stable and robust CPU times per event, event sizes ‘within specifications’ Digitisation (as in Rel. 7.6.0+) could not be tested for all sub-detectors (missing or not working) for the tested ones, digitisation is working and stable reason for confidence in working digitisation procedure for the whole detector in/after Rel. 7.7.0 Pile-up not yet fully functional Documentation on pre-production activities available from DC webpage http://atlas.web.cern.ch/Atlas/GROUPS/SOFTWARE/DC/DC2/preprod contains also how-to’s (running event generation, simulation, digitisation) Conclusions Status of the Software for Data Challenge 2 Armin Nairz Status of the Software for Data Challenge 2 Armin Nairz
16
ATLAS SW CZ Seminář 2.4.2004chudoba@fzu.cz Další schůze GRID Analysis Tools Distributed Analysis... Atlantis Tutorial Athena Tutorial
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.