Download presentation
Presentation is loading. Please wait.
Published byTyrone Austen Hunt Modified over 9 years ago
1
Quantifying change order impact on productivity by using ANN approach ECE 539 Project Presentation (Order: 316) Min-Jae Lee Construction Management Program Civil & Environmental Engineering Department University of Wisconsin - Madison
2
Research Background Productivity loss (Delta: ) happen “Owner” & “Contractor” conflict ---Claims We need “Models” developed by historical data Model 1: Was the project impacted by change orders or not Model 2: How much impacted by change orders Direct Field Labor Hours Construction Phase (% Complete) 0100 Estimate Base Change Delta Total Actual Labor Hours (Base + Change) (Hanna et al. 1999a, 1999b)
3
Data Characteristics 140 case study from U.S. area [impacted(50) / unimpacted(50)] Ask 70 Indicator factors related with change orders Find “significant factors” by using Statistical method (20 factors, correlation test, significant test)
4
Previous Research & ANN approach Model1(Impact): bp 20 feature factors Impacted or Not Model2(% Delta ): RBN % Delta Output Training data size: 100 cases, Testing sample size: 30 cases 20 feature factors Model2: Regression Model % delta = + 0.36866 + 0.11957 Percent Change - 0.08065 PM%TimeOnProject - 0.16723 %OwnerInitiatedCO - 0.09147 Productivity -0.05213 Overmanning + 0.022345 ProcessingTime Model1: Logistic Regression 75% Accuracy Average = =72.2% %Error lX actual – X estimated l X estimated
5
Results & Discussion Model1(Impact): bp Model2(% Delta ): RBN Logistic Regression C_rate = 71% Training C_rate = 87% Testing C_rate = 82% Average %Error = lX actual – X estimated l X estimated Regression Model: 73% RBN Model: 14%
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.